21.85m(L)x13.85m(W)x6m(H) Star Marquee Instruction Manual www.herculesgazebo.co.nz [email protected] 0800 810 910
PEG PLACEMENT
Start by lifting one spigot base(E1) out of the ground and place back in the ground through one of the template rings. Lay one side of the
template along the painted line previously marked, and square out the other template so the template rings are point H1 and H2. Painted mark
on the ground through the both the template rings at this point, swing the template over to the other side either the marquee keeping one side
template on the original painted line, lay the line on the ground through the blank template ring point H3, remove the spigot base and template,
replace the pole spigot base into the hole, repeat these steps to other end of the marquee, starting the other spigot base(E2).
All peg locations should now be identified and drilled out in the ground using a sledge hammer, each peg must be fully drilled in the ground
vertically and leaving only the top section with washers pre-drilling, they are not to be angle otherwise it will be difficult to hook the marquee legs
onto them.