11
5 Dispensing
5.1 First Operation
5.1.1. Priming the Feed Line
● Check that the product reservoir, the dispensing valve and the footswitch are
connected correctly according to their operating manuals.
● To avoid air bubbles during dispensing, the product line must be filled and then purged
of air.
● Position the dispensing valve as specified in its instruction manual to ensure bubble-
free filling of the product line.
Caution!
Place a container under the dispensing valve since the product will flow out.
● Switch the power switch
7
to the position
I
(ON).
● With the pressure regulator
8
set the
dispensing pressure to 0.50 bar
(approx. 7 psi).
● Press button until the product flows
free of bubbles from the dispensing
needle.
● For viscous products, increase the
pressure slowly in steps until the
product flows out.
Caution!
Hold the dispensing valve pointing downward to prevent uncontrolled squirting out of the
product.
Содержание Loctite 135550
Страница 1: ...22121 97102 135550 ...
Страница 2: ...2 ...
Страница 18: ...18 8 Pin Assignment 8 2 XS1 External Start 8 3 XS1 Start via Promixity Switch ...
Страница 20: ...20 9 Declaration of Conformity ...
Страница 21: ...22121 ...
Страница 37: ...37 8 Steckerbelegung 8 2 XS1 Externer Start 8 3 XS1 Start über Näherungsschalter ...
Страница 39: ...39 9 CE Konformitätserklärung ...