Helmer Scientific i.Series
®
Ultra-Low Freezer
Operation Manual
360172-A/D
8
3
i.Series Operation
3.1
Initial Start Up
1.
Plug the power cord into a 15 A grounded circuit with a dedicated single point receptacle.
2.
Switch battery ON/OFF switch
ON
.
3.
Switch AC ON/OFF switch
ON
.
Note
The Start screen is displayed when the i.C
3
is powered on. The i.C
3
monitoring and control system will take approximately
three minutes to boot up.
Start screen
The language screen is displayed after the i.C
3
is powered on. Use the Language screen to select the i.C
3
display language.
Language screens
Note
English is the default language.