Installation Instructions and Instructions for Use
Subject to technical modifications
–
Date of Issue March/2021
65
Electric supply line
230 Place the V-mains
cable (2) from the junction
box (1) to the column
provided for the power
supply (A, B, C or D). The
cables are placed in the
upper groove of the left and
the right basic profiles; and
in the highlighted areas of
the front and rear basic
profiles (see figure
opposite).
V
C
D
B/C
1
2
B / C
A/D
Installation Instructions and Instructions for Use
66
Subject to technical modifications
–
Date of Issue March/2021
Electric supply line
Fig. 7
Fig. 8
Connect the Hirschmann
connector of the mains
cable (3) at the column
provided for the power
supply (Fig. 8). Stow the
connector (3) in the column
provided for the power
supply (4) (Fig. 9).
The client has to to ensure
that a professional strain
relief (5) is provided at the
Hirschmann connector
STAK 3/STAS 3 for the
cables stowed in the
column.
Legend
Junction box (230 V)
230 V-mains cable with Hirschmann connector STAS 3
Hirschmann connecter STAS 3/STAK 3 for mains cable (230 V)
Column provided for the power supply
Provide a professional strain relief at the cable
3
4
5
Installation Instructions and Instructions for Use
Subject to technical modifications
–
Date of Issue March/2021
67
Installation of the slats
Hinge the slats one after
the other starting from side
H (rear). Side H is the side,
where the distance to the
first swivel bolt (5) is 170
mm (see Fig. on the
following pages).
Observe the hanging
direction of the slats. The
slats open facing towards
the direction of side H.
Rule of thumb: The slat
brushes must show in the
direction of Side H when
the slat is half open (45° as
in the figure).
A
B
C
D
H
V
L
R
45°
0°
V
R
45°
H
Installation Instructions and Instructions for Use
68
Subject to technical modifications
–
Date of Issue March/2021
Installation of the slats
100
170
H
R
H
R
H
R
B
B
B
~
2
1
3
4
5
7