33
P/N 240010943, Rev. C [09/07/2016]
9.1
Fill Boiler With Water And Purge Air
NOTICE
To maintain boiler efficiency and prevent boiling
inside the heat exchanger, flush entire heating
system until clean.
• Flush heating system, including all heating zones.
• Fill boiler with potable water.
• Fill boiler and system piping with water (or
antifreeze-water solution, if used). See antifreeze
information page 13. Purge air from boiler using
safety relief valve. Purge air from system piping.
• Inspect system piping and boiler connections.
Repair any leaks immediately.
• Activate all heating zones and calls for heat,
including CH calls and DHW calls (if available).
• Close manual gas shut off valve. Let system run for
30 minutes. When boiler goes into lockout, reset
boiler by pressing "Reset" button until boiler resets.
• Do not open gas shutoff valve until all air is purged
from system.
9.2
Fill Condensate Trap with Water
• Remove spring tension clip from clear hose attached
to barbed fitting at bottom of flue collector.
See
figure 9-1.
•
Disconnect hose from barbed fitting.
•
Fill trap through fitting with approximately 2 cup
(473
ml) water.
•
Place hose barbed fitting back through bottom of
chassis.
•
Reassemble clear tube to barbed fitting.
•
Secure tube to barbed fitting with spring tension clip.
See figure 9-1.
FIGURE 9-1 Condensate Drain Assembly -
Option may
be located on Left or Right Side of boiler
NOTICE
IMPORTANT: Condensate trap must be manually
filled with water at initial start up.
9 - START UP PROCEDURE
Condensate Trap
Hose Removed From
Hose Barb with Spring
Tension Clip
Secure Hose onto
Hose Barb with
Spring Tension Clip
Secure Hose onto
Hose Barb with
Spring Tension Clip
Hose Removed From
Hose Barb with
Spring Tension Clip
Condensate Trap
Содержание VX-399
Страница 50: ...50 P N 240010943 Rev C 09 07 2016 13 TROUBLE SHOOTING ...
Страница 62: ...62 P N 240010943 Rev C 09 07 2016 14 3 Connection Diagram 399 MBH 14 WIRING DIAGRAM ...
Страница 63: ...63 P N 240010943 Rev C 09 07 2016 14 4 Schematic Diagram of Ladder Form 399 MBH 14 WIRING DIAGRAM ...
Страница 81: ...81 P N 240010943 Rev C 09 07 2016 Company Address Phone Company Name Tech Initials Service Performed Date ...
Страница 82: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...