71
1.4
Sequence of Operation
Operational State
User Interface Display
Explanation
If flame detected before Gas Valve
opens during ignition boiler will
lockout.
Please refer to troubleshooting guide.
Gas Valve energized to deliver air/fuel
to burner.
If flame undetected after 3 seconds
boiler will de-energize Gas Valve and
enter post purge mode for 30 seconds.
Ignition attempted 5 times before
lockout.
Boiler will run provided all operational
and safety devices are within limits
Refer to for more information.
Control module adjusts firing rate
according to heating demand. When
Boiler detects demand met, will enter
post purge mode then standby mode.
If simultaneous demand for Central
Heat and DHW, boiler will enter DHW
Priority Mode.
Priority mode limits amount of time
boiler can run in DHW mode to meet
CH demand.
Max DHW Priority Time setting
determines maximum time allowed for
DHW heating mode.
Please refer to section Appendix A
section 1.5 for more information.
Flame
Detected?
Gas Valve
Energized
Flame
Detected?
Heat Demand
Met?
DHW
Priority
Mode
Simultaneous
DHW + CH
Demand?
No
Yes
No
Yes
See Max DHW
Priority Time
Setting
No
After 2 seconds
After 3 seconds
No
30 second
post purge
Yes
Yes
Lockout
Error A21
Note:
5 Ignition
trials,
then
Lockout A01
APPENDIX A - CONTROL MODULE
Содержание VX-050
Страница 49: ...49 13 TROUBLE SHOOTING...
Страница 51: ...51 13 TROUBLE SHOOTING...
Страница 63: ...63 14 1 Connection Diagram 050 075 100 MBH 14 WIRING DIAGRAM...
Страница 64: ...64 14 2 Schematic Diagram of Ladder Form 050 075 100 MBH 14 WIRING DIAGRAM...
Страница 65: ...65 14 3 Connection Diagram 150 200 MBH 14 WIRING DIAGRAM...
Страница 66: ...66 14 4 Schematic Diagram of Ladder Form 150 200 MBH 14 WIRING DIAGRAM...
Страница 83: ...83 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 50 75 100 MBH...
Страница 84: ...84 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 50 75 100 MBH...
Страница 85: ...85 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 150 200 MBH...
Страница 86: ...86 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 150 200 MBH...
Страница 87: ...87 NOTES...
Страница 88: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...