
25
1"(2.54cm)
Maximum
Combustion
Air
Vent
FIGURE 6-4 Side Wall Concentric Terminal
FIGURE 6-5 Side Wall Concentric Terminal Multiple
Appliances
1" (25.4mm)
Maximum
Maintain 12"
clearance above
highest anticipated
snow level or grade
* See Note
Below
Vent
Combustion
Air
1" (25mm)
Maximum
Roof
Overhang
36"(0.9m(914mm)
(28m)) Minimum
Maintain 12"(30cm) US
(18"(46cm) Canada)
Clearance Above
Highest Anticipated
Snow Level Or Grade
12" (305mm) Minimum
*Must be less than 4" (102mm) or greater than 24"
(610mm) Horizontal distance between end bells of each air
intake to prevent flue gas recirculation.
FIGURE 6-6 Concentric Terminal Connection
Note: Securing strap must
be field installed to prevent
movement of termination
kit in side wall
Vent
Combustion Air
1"(25.4mm)
Maximum
**See
Note
*2 or 3" (51 or 77 mm) Diameter
PVC intake/combustion air
Combustion Air
*2" (51mm) Diameter = 41" Length (1.1m)
3" (77mm) Diameter = 47" Length (1.2m)
** Note Overall length may be modified by cutting or extending
both combustion air and vent pipes. 12" (305mm) is minimum
allowable length and 60" (1.2m) is maximum allowable length for
this dimension.
SDR-26 PVC (D2241) only may be used for extending pipes.
Do not use Schedule 40 PVC or use couplings to extend pipes.
Dimension will change if intake/vent pipes are lengthened or
shortened.
OD 3
½
"
(89mm)
- *2"
(51mm)
kit
OD 4
½"
(114mm)
- 3"
(77mm)
kit
* Note: 2" (51mm) For use with models 050/075/100.
3" (77mm) For use with models 075/100/150/200
6 - COMBUSTION AIR AND VENT PIPING
Содержание VX-050
Страница 49: ...49 13 TROUBLE SHOOTING...
Страница 51: ...51 13 TROUBLE SHOOTING...
Страница 63: ...63 14 1 Connection Diagram 050 075 100 MBH 14 WIRING DIAGRAM...
Страница 64: ...64 14 2 Schematic Diagram of Ladder Form 050 075 100 MBH 14 WIRING DIAGRAM...
Страница 65: ...65 14 3 Connection Diagram 150 200 MBH 14 WIRING DIAGRAM...
Страница 66: ...66 14 4 Schematic Diagram of Ladder Form 150 200 MBH 14 WIRING DIAGRAM...
Страница 83: ...83 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 50 75 100 MBH...
Страница 84: ...84 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 50 75 100 MBH...
Страница 85: ...85 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 150 200 MBH...
Страница 86: ...86 PRIMARY LOOP EQUIVALENT LENGTH CALCULATION PUMP SELECTION 150 200 MBH...
Страница 87: ...87 NOTES...
Страница 88: ...DUNKIRK BOILERS 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com...