NOTES

3

S O L A R   H O T   W A T E R 

   

1. PREPARATIONS

1.0. General Notes

1.0.0. Safety Guidelines 

Carefully review all instructions in this manual for installation and use.  Do not modify Gobi 
Collectors or Helio-Pak under any circumstances; use only as designed.  This manual and 
its content are integral parts of both the Helio-Pak and Gobi Solar Collector warranties.  
Noncompliance with these guidelines will void all warranties.

Follow all local building codes and regulations, as well as these industry accepted 
guidelines and standards:

IAPMO

   

USEC, UBC, UPC

ASHRAE

 

Solar Energy Equipment

NFPA 70

 

National Electric Code

ASCE 7-05

 

Minimum Design Loads for Buildings and Other Structures

Select an installation location that is easily accessible for maintenance and servicing.

1.0.1. Collector Storage and Handling

Keep collectors covered when storing.

Avoid lifting collectors by the headers.  Take care not to scratch the tempered solar glass; 
follow the glass breakage guidelines at the end of this manual in case of breakage.

Gobi collectors nest and lock into each other for horizontal transportation.  Do not 
transport Gobi upside down or standing on a side.

1.0.2. Collector Installation

Make a site visit prior to installation to verify adequate installation conditions:

  Collector sun exposure, especially during crucial solar hours of 10AM 

• 

– 2PM.  

Take into consideration deciduous tree shading, structures, chimneys, etc.

 

Use a minimum tilt of 10

• 

° in mild areas and 30° in areas with snow.

  Orient collectors within 20° of true South (in North latitudes); use internet maps 

• 

rather than compass readings for verification.

  Ideal collector tilt for hot water production is equal to site latitude.  For space 

• 

heating combination systems, use tilt equal to latitude plus 15°.  Heliodyne 
recommends a standard of 35° for hot water and 45° for space heating, 
regardless of location.  Use racks only when necessary, as variation up to 15° 
can have only small effects on performance.

 Avoid 

banking

• 

 of snow and ice below or on the collectors.

 

Never mount Gobi collectors horizontally in a drainback system.

• 

 

• 

Heliodyne recommends 6-12” of flex tubing before any rigid copper lines to allow 

for thermal expansion in the copper tubing.

1.0.3. Minimum Heat Storage

A minimum of 1.5 – 2.0 gallons of liquid heat storage per square foot of Gobi collector 
(e.g., 60 – 80 gallons per Gobi 410) is recommended.

Minimize stagnation (no load, no flow) conditions on peak output days by using 
appropriate system sizing and maximizing year round usage. For design assistance, 
contact Heliodyne.

Ensure the backup heating capacity is properly sized to produce hot water for installation 
site on days of little or no solar energy production.  Use only ASHRAE 90.2 compliant 
storage tanks and heaters with R-16 or higher.

1.0.4. Equipment for Installation

For a complete and functional SHW system, ensure the following equipment is ready for 
installation at the job site:

 

Gobi Solar Collectors

• 

 

Rack or Flush mount hardware kit

• 

 

Appropriate roof penetration hardware and sealant

• 

  Copper tubing, type M or L for collector / heat transfer appliance connections, 

• 

adapters, elbows and fittings.

 

96/4 Tin/Silver solder

• 

 

Non-rubber based insulation (Armaflex); 1/2” wall / R2.6l minimum

• 

 

UV resistant covering or coating for outdoor exposed insulation

• 

 

Helio-Pak heat transfer appliance (HPAK)

• 

 

Isolation valves, tempering valve, air vent

• 

 

Storage tank with adequate volume for collectors installed

• 

 

Connections for storage tank (flexible or otherwise)

• 

 

Dyn-O-Flo HD high temperature propylene glycol or equal

• 

  Pipe hangers or supports installed per code requirement installed without 

• 

compromising any insulation.

1.0.5. Tools

Heliodyne collectors and heat transfer appliances do not require any special tools.  Never 
use plumbing wrenches on hex connections.  Always tighten the bolts rather than the 
nuts.  Aside from using the standard plumbing tools (torch, pipe cutter, etc.) the following 
tools and sizes are used in Heliodyne equipment:

 

9/16” wrench / socket for 3/8”- 16 bolts and nuts

• 

 

3/4” wrench / socket for 1/2” - 13 hanger bolts and nuts

• 

 

Adjustable hex wrench for 1.25” thru 1.875” hex sizes

• 

 

Phillips screw driver (for tank sensor installation)

• 

 

1/4” drill bit for 3/8” lag screws

• 

 

3/8” drill bit for 1/2” lag screws

• 

1.0.6. Safety Equipment

Working on roof tops and other elevated collector installation sites as well as using 
flames can be dangerous; use extreme caution and follow all local codes and good safety 
practices when installing.  Heliodyne is not responsible for job safety nor any accidents 
that may occur, and always recommends:

 

Safety glasses         

• 

 

Roof harness            

• 

 

Scaffolding rather than ladders

• 

 

Solder in well ventilated areas 

• 

1.0.7. Heliodyne OG-300 Certified Systems and SRCC Numbers

Installers: check box next to OG-300 system installed (if applicable)

 

HPAK 016 1 408 G 65 ACS 

300-1992-010A

 

HPAK 016 1 410 G 80 ACS 

300-1992-010B

 

HPAK 016 2 408 G 120 ACS  300-1992-010C

 

HPAK 016 1 406 G 50 ACS 

300-1992-010J

 

HPAK 016 1 406 G 80 ACS 

300-1992-010K

 

HPAK 016 2 406 G 80 ACS 

300-1992-010L

 

HPAK 016 2 406 G 120 ACS  300-1992-010M

 

HPAK 016 1 408 G 80 ACS 

300-1992-010N

 

HPAK 016 2 410 G 120 ACS  300-1992-010O

 

HPAK 016 1 410 G 65 ACD 

300-1992-013A

 

HPAK 016 2 408 G 80 ACD 

300-1992-013B

 

HPAK 016 2 408 G 120 ACD  300-1992-013C

 

HPAK 016 2 410 G 120 ACD  300-1992-013D

 

HPAK 016 1 408 G 65 ACD 

300-1992-013F

 

HPAK 016 1 406 G 80 ACD 

300-1992-013G

 

HPAK 016 2 406 G 80 ACD 

300-1992-013H

 

HPAK 016 1 408 G 80 ACD 

300-1992-013I

 

HPAK 016 1 410 G 80 ACD 

300-1992-013J

 

HPAK 016 1 410 G 80 ACD Z  300-1998-001A

 

HPAK 016 2 408 G 80 ACD Z  300-1998-001B 

 

HPAK 016 2 408 G 120 ACD Z  300-1998-001C

 

HPAK 016 2 410 G 120 ACD Z 300-1998-001D

 

HPAK 016 1 408 G 65 ACD Z  300-1998-001F

 

HPAK 016 1 406 G 80 ACD Z  300-1998-001G

 

HPAK 016 2 406 G 80 ACD Z  300-1998-001H

 

HPAK 016 1 408 G 80 ACD Z  300-1998-001I

The solar energy system described in this Manual, when properly installed 
and maintained, meets or exceeds the minimum standards established by 
the SRCC.  This certification does not imply endorsement or warranty of this 
product by SRCC.

Contact Heliodyne for service in your area: 1.888.878.8750

Содержание GOBI 406 001

Страница 1: ...EXCELLENCE BY DESIGN INSTALLATION GUIDE HPAK SYSTEMS S O L A R H O T W A T E R ...

Страница 2: ...TABLE OF CONTENTS 1 PREPARATIONS 3 9 GOBI INSTALLATION 10 11 2 12 13 14 16 20 21 17 19 3 HPAK INSTALLATION 4 PIPING 5 COMMISSIONING 6 O M ...

Страница 3: ...r Flush mount hardware kit Appropriate roof penetration hardware and sealant Copper tubing type M or L for collector heat transfer appliance connections adapters elbows and fittings 96 4 Tin Silver solder Non rubber based insulation Armaflex 1 2 wall R2 6l minimum UV resistant covering or coating for outdoor exposed insulation Helio Pak heat transfer appliance HPAK Isolation valves tempering valve...

Страница 4: ...9 93 37 47 g Dry Weight lb 97 110 128 G Full Weight lb 103 2 116 9 135 8 V Volume Gal 0 75 0 83 0 95 Max Pressure PSI 150 10 Bar Test Pressure PSI 300 20 Bar Stag Temp F 397 6 203 C A F D P W M T L H 1 2 Flow and Pressure Loss1 RECOMMENDED DESIGN FLOW RATES WITH GLYCOL2 GOBI 406 GOBI 408 GOBI 410 0 85 Gal min 1 0 Gal min 1 25 Gal min PRESSURE DROP PLOT 1 Losses calculated at recommended Gobi desig...

Страница 5: ...i Orientation and Plumbing OR OR Figure 1 3 2 Two DOS Discs Per Vertical Array Figure 1 3 1 DOS Disc Assembly p n 50013 Figure 1 3 3 Two DOS Discs Per Horizontal Collector S 15 15 15 Helio Pak Helio Flo Drain Back Helio Pak Helio Flo Drain Back Combi DHW DHW Pool 45 35 2x ...

Страница 6: ...22 5 Figure 1B 1 HPAK Dimensions HPAK 0XX 00X Heat Exch 000 Std 001 Pro 016 000 Btu hr 024 000 Btu hr 032 000 Btu hr 048 000 Btu hr Control 1 5 Technical Specifications Maximum Operating Conditions 150 psig 275 F Heat Transfer Fluid 40 50 Dyn O Flo HD and Water Solar Loop Connections Compression fittings for 3 4 Type M or L Copper 7 8 OD ASTM B88 Domestic Water Connections 3 4 Male NPT Fittings Pr...

Страница 7: ...ket for combo valves 3 14 Combo Valve Hot 23090 Hot combination valve check ball temperature 1 15 Combo Valve Cold 23091 Cold combination valve check ball temperature 1 16 Combo Valve Fill 23092 Filling combination valve 1 17 EX 2 EX 5 23030 23031 2 gallon bladder type expansion tank 5 gallon bladder type expansion tank 1 20 Tank Bracket 21204 Tank mounting bracket 1 22 Mtg Screws 21194 1 4 20 x 1...

Страница 8: ...ration of Pressure Relief Valve and Expansion Tank The HPAK comes with a preinstalled pressure only relief valve nonadjustable and pre set at 150 psig A 1 4 barbed hose fitting is supplied for routing relief fluid to a drain or retaining vessel In addition the system comes with a pre sized bladder type expansion tank The acceptance volume of the expansion tank should be large enough to store up to...

Страница 9: ...tlet and wire the storage and collector sensor appropriately The control comes prewired with two sensor lines Use 22 AWG or larger cable if the sensor lines need to be extended Connect the sensors to wire using non metal wirenuts or other corrosion resistant connection method Ensure the control high limit is set at or below the tank manufacturer s recommended limit If attaching additional sensors ...

Страница 10: ...TY 1 CLIP 000 000 40082 Gobi Rail Clamp 3 8 16 x 1 SS Bolt Flange Nut set of 4 1 Gobi 2 RAIL 002 000 40090 2x102 0 Gobi Mounting Rail 2xCLIP 000 000 set See Note 1 3 RACK 000 000 RACK 000 001 RACK 000 002 40080 40081 40083 Commercial Mount 4 Front Leg 47 Rear Leg Flat Roof Rack Mount 4 Front Leg 47 Rear Leg Flat Roof Rack Mount 8 Front Leg 47 Rear Leg Gobi 1 4 RAIL 000 001 40089 Splice Kit for Joi...

Страница 11: ...ts the distance between front and rear mounting points Rear Leg Height Front Leg Height Tan Gobi Tilt Angle 3 Brace rails for first collector 4 Place first collector and install all 4 Helio Clips Tighten bolts on Helio Clips to engage locking serrated flange nut Roof Sealant RACK MOUNTING INSTALLATION 11 S O L A R H O T W A T E R 5 Insert O rings tighten Unions Take care not to crimp O ring Do not...

Страница 12: ...r Mounting Kit Shingle Mount Hanger Bolt Kit Shingle Mount Flange Kit Tile Mount Kit Gobi 1 4 RAIL 000 001 40089 Splice Kit for Joining Rails 1 Kit E F H G N D 3 8 16 x 1 SS Bolt1 1 2 13 SS Flange Nut 3 8 16 SS Flange Nut 1 2 13 x 1 25 SS Bolt 3 8 SS Flat Washer1 1 2 13 x 6 SS Hanger Bolt Flush Mount Flange 3 8 x 4 SS Lag Screw Tile Bracket Gobi Collector Clip Rail L Bracket 1 2 SS Flat Washer 3 8...

Страница 13: ...late to drill two 3 8 holes for lag screws add roof sealant to holes and flange Lag in 2 screws Place 3 OATEY 1 1 4 flashing over flange Replace 4 shingle over flashing follow best roofing practices to ensure seal Remove 1 tiles Locate a rafter and use tile bracket as template to drill three 3 8 holes for lag screws add roof sealant to holes Lag in 2 screws Replace 3 tiles over bracket follow best...

Страница 14: ...DIPTUBE SHORT DIPTUBE SHORT DIPTUBE Helio Tank 119 Helio Tank 80 DRAIN Figure 3 0 1 HPAK Connections Figure 3 0 2 HPAK Hydraulic Figure 3 1 1 HPAK and Helio Tank 119 Connections Figure 3 1 2 HPAK and Helio Tank 80 Connections 3 1 Tank Orientation If using a Helio Tank for installation orient the proper solar connections in line with the HPAK connections to eliminate piping On all tanks ensure prop...

Страница 15: ... specific area is not available attach to a metal drain disconnected lower element or use the cold in for lower tank sensor use the hot out for a top tank sensor The collector sensor must go on the outlet header of the array For Pro models the energy production is default set to calculate via the collector outlet sensor and the pre installed flow meter temperature and flow sensor For greater accur...

Страница 16: ...the outer mounting holes on the flattened part of the X Align the top and bottom lugs on the X with the top and bottom mating holes on the HPAK pre mounted bracket and hang Pull the HPAK down to lock in the lugs with the HPAK bracket holes 3 5 Expansion Tank Mounting Helio Paks come with a pre sized expansion tank of bladder type If the shipped expansion tank volume is less than 1 5th of the total...

Страница 17: ...ics below Use dielectric unions when connecting piping to the storage tank nipples When using the Helio Tank appropriately sized flex hoses can be purchased from Heliodyne to avoid rigid copper plumbing In the case of standard storage tanks Heliodyne Gas Tank or multiple tanks this is unavoidable When using the Helio Tank the DHW Cold is shared with the HPAK Cold NEVER share the hot DHW and HPAK t...

Страница 18: ...e 4 2 5 Flow Thru Connection 4 2 Different Tank Schematics If your tank is not here contact Heliodyne with questions Refer to the valve descriptions on the previous page In accordance with SRCC standard OG 300 all piping and valves must be labeled Attach the waterproofed labels provided with this manual to the appropriate components using zip ties NOTE For single tank electric systems disconnect l...

Страница 19: ...tion with environment protection or Solar Pipe from Heliodyne Gobi collectors can be put in portrait arrays of up to eight Install bleed vents for filling at local high points Install a flexible arm or line on either side of the inlet and outlet to allow for header expansion 4 3 0 Portrait Single Collector or Array 4 3 1 Single Horizontal Collector 4 3 2 Multiple Horizontal Collectors 4 3 3 Multip...

Страница 20: ...rements Air vents or bleed vents at the high points in the system help rid the system of air during filling only If using any type of automatic air vent close vent after filling is complete as vents are not suitable for glycol systems or systems without continuously replaced fluids For use with a pump connect pump supply hose to position 3 at right and return hose to position 2 Turn 1 so slot is h...

Страница 21: ...ube valve for pressurization it should be charged with approximately 25 psig 6 0 3 Check the glycol color concentration and pH Heliodyne has glycol testing kits that perform the required analysis Review the data sheet for Dyn O Flo HD in this manual for proper levels Glycol should be a bright green color anything else needs to be replaced Use only Dyn O Flo HD or equivalent 6 0 4 Check the control...

Страница 22: ...otection Use safety glasses Spills Cover with absorbent material soak up and seep into bag Disposal Discharge into sanitary sewers only with the explicit pre approval of the local waste water facility Any disposal practice must be in compliance with federal state provincial and local laws and regulations Check with the appropriate agencies 7 0 5 Maintenance The glycol water mix should be tested pe...

Страница 23: ...liodyne Customer Service by email at sales heliodyne com by letter to 4910 Seaport Ave Richmond CA 94804 Provide proof of purchase and date Should service be requested and no defect found in the Product then a reasonable charge will be made for the service In no event shall HELIODYNE be liable for the following Conditions resulting from a defect in a component or part that does not make up the HEL...

Страница 24: ...Heliodyne Inc 4910 Seaport Avenue Richmond CA 94804 T 510 237 9614 F 510 237 7018 www heliodyne com Sales Inquiries sales heliodyne com Information and Support info heliodyne com ...

Отзывы: