- Become familiar with the equipment and its operation.
- Isolate system electrically.
- Before attempting the procedure, ensure that:
• mechanical handling equipment is available, if required, for handling refrigerant cylinders;
• all personal protective equipment is available and being used correctly;
• the recovery process is supervised at all times by a competent person;
• recovery equipment and cylinders conform to the appropriate standards.
- Pump down refrigerant system, if possible.
- If a vacuum is not possible, make a manifold so that refrigerant can be removed from various parts of the system.
- Make sure that cylinder is situated on the scales before recovery takes place.
- Start the recovery machine and operate in accordance with manufacturer's instructions.
- Do not overfill cylinders. (No more than 80 % volume liquid charge).
- Do not exceed the maximum working pressure of the cylinder, even temporarily.
- When the cylinders have been filled correctly and the process completed, make sure that the cylinders and the
equipment are removed from site promptly and all isolation valves on the equipment are closed off.
- Recovered refrigerant shall not be charged into another refrigeration system unless it has been cleaned and checked.
Labelling
- Equipment shall be labelled stating that it has been de-commissioned and emptied of refrigerant. The label shall be
dated and signed.
- Ensure that there are labels on the equipment stating the equipment contains flammable refrigerant.
Recovery
- When transferring refrigerant into cylinders, ensure that only appropriate refrigerant recovery cylinders are employed.
- Ensure that the correct number of cylinders for holding the total system charge are available. All cylinders to be used
are designated for the recovered refrigerant and labelled for that refrigerant (i.e. special cylinders for the recovery of
refrigerant).
- Cylinders shall be complete with pressure-relief valve and associated shut-off valves in good working order. Empty
recovery cylinders are evacuated and, if possible, cooled before recovery occurs.
- The recovery equipment shall be in good working order with a set of instructions concerning the equipment that is at
hand and shall be suitable for the recovery of all appropriate refrigerants.
- A set of calibrated weighing scales shall be available and in good working order. Hoses shall be complete with leak-
free disconnect couplings and in good condition. Before using the recovery machine, check that it is in satisfactory
working order, has been properly maintained and that any associated electrical components are sealed to prevent ignition
in the event of a refrigerant release.
- The recovered refrigerant shall be returned to the refrigerant supplier in the correct recovery cylinder, and the relevant
waste transfer note arranged.
- Do not mix refrigerants in recovery units and especially not in cylinders.
- If compressors or compressor oils are to be removed, ensure that they have been evacuated to an acceptable level to
make certain that flammable refrigerant does not remain within the lubricant.
- The evacuation process shall be carried out prior to returning the compressor to the suppliers.
- Only electric heating to the compressor body shall be employed to accelerate this process.
Vorsicht
7
Содержание CA035-A1
Страница 1: ...No 0150540389 CA035 A1 CA050 A1 CA070 A1 Polski...
Страница 2: ......
Страница 4: ......
Страница 23: ...Lhlm ff mdih Rki _nk 19 Lh_iik nhdm R h f CA070 A1 PB 950HE4 PB 700HE4 CA035 A1 CA050 A1...
Страница 28: ......
Страница 30: ......
Страница 49: ...Innenger t Panel PB 700HE4 Installationsverfahren CA035 A1 CA050 A1 19 CA070 A1 PB 950HE4...
Страница 54: ......
Страница 56: ......
Страница 76: ...20 Procedura monta u Jednostka wewn trzna P yta czo owa CA035 A1 CA050 A1 PB 700HE4 CA070 A1 PB 950HE4 Polski...