4. Inspection and
maintenance
Proper functioning of the ventilation system, its capacity
and its service life can only be assured if the system is
inspected and maintained in accordance with the
following instructions. These instructions are based on
normal operating conditions.
ä
Caution!
If the ventilation system is being used under harsh
operating conditions or in a very dirty environment,
extra maintenance may be required.
4.1. Inspection and maintenance
schedule
Inspection schedule
User
Installer
G3 filter
Check for soiling
1 week
—
G4 filter
9 months
1 year
F7 filter
6 months
1 year
Ventilation unit
Check for soiling and leakage
6 months
1 year
Motor module
Check for soiling/imbalance
—
1 year
Bypass valve/Frost valve
Check functioning and for soiling
—
1 year
Heat exchanger
Check for soiling
—
1 year
Air valves
Check for soiling
3 months
1 year
Ducts
Check for soiling
—
4 years
Maintenance schedule
User
Installer
G3 filter
Clean (first 3 months)
1 week
Where necessary
Replace (with G4 or F7)
3 months
Where necessary
G4 filter
Clean
9 months
Where necessary
Replace
18 months
Where necessary
F7 filter
Clean
6 months
Where necessary
Replace
12 months
Where necessary
Insect filter
Clean
12 months
Where necessary
Ventilation unit
Clean condensate hose
—
1 year
Fan module
Clean
—
4 years
Heat exchanger
Clean
—
1 year
Bypass valve/Frost valve
Clean
—
1 year
Air valves
Clean
3 months
1 year
Ducts
Clean
—
8 years
17
Содержание HRU ECO 4
Страница 1: ...HRU ECO 4 User manual...
Страница 2: ...Translation of the original document...