
02/04
4031-117 Rev I
17
NOVUS DIRECT VENT INSTALLATION INSTRUCTIONS
2. Top Vent
a. Clearances
See Figure 31 for clearance information.
b. Vent Lengths
Various venting configurations are shown in Figures 32 and 33 from which maximum vent runs can be determined.
Figure 31 - Vertical Termination Clearances
Figure 32 - Vertical Termination Vent Lengths
Figure 33 - Vertical Termination Vent Lengths
WARNING!
Always maintain minimum clearances or greater
around the chimney system. Do not pack air spaces
with insulation or other material.
Installer Note:
If installing a vertical vent/termination
run off the top of the appliance, the optional vertical ter-
mination baffle may be used.