background image

14 

Heatilator • Eclipse • 4049-300 Rev H • 11/07

A. Vent Table Key

The abbreviations listed in this vent table key are used in the 
vent diagrams.

Symbol

Description

V

1

First section (closest to appliance) of vertical length

V

2

Second section of vertical length

H

1

First section (closest to appliance) of horizontal length

H

2

Second section of horizontal length

Fire Risk
Explosion Risk
Asphyxiation Risk

Do NOT connect this gas appliance to a 
chimney 

fl

 ue serving a separate solid-fuel 

or gas burning appliance.
•  Vent this appliance directly outside.
•  Use separate vent system for this 

appliance.

May impair safe operation of this appliance or 
other appliances connected to the 

fl

 ue.

WARNING

B. Use of Elbows

Diagonal runs have both vertical and horizontal vent aspects 
when calculating the effects. Use the rise for the vertical as-
pect and the run for the horizontal aspect (see Figure 5.1).

Two 45° elbows may be used in place of one 90° elbow. On 
45° runs, 1 ft of diagonal is equal to 8-1/2 in. horizontal run 
and 8-1/2 in. vertical run. A length of straight pipe is allowed 
between two 45° elbows (see Figure 5.1).

ALL vent configuration specifications MUST be 
followed.
•  This product is tested and listed to these 

speci

fi

 cations.

•  Appliance performance will suffer if speci

fi

 cations 

are not followed.

CAUTION

C.   Measuring Standards

Vertical and horizontal measurements listed in the vent dia-
grams were made using the following standards.

•  Pipe measurements are shown using the effective length 

of pipe (see Figure 5.2).

•  Measurements are made from the appliance outer wrap, 

not from the standoffs.

•  Horizontal terminations are measured to the outside 

mounting surface (

fl

 ange of termination cap) (see Figure 

4.1).

•  Vertical terminations are measured to top of last pipe 

before termination cap.

•  Horizontal pipe installed level with no rise.

Horizontal

Vertical 

8-1/2 in. 

8-1/2 in. 

12 in. 

Figure 5.1  Using Two 45° Elbows

Effective

Height/Length

Figure 5.2  SL Pipe Effective Length

Vent Information and Diagrams 

Pipe

Effective

Length/Height

SL-06D

5-3/4 in.

SL-09D

8-3/4 in.

SL-12D

11-3/4 in.

SL-12/17D

11-3/4 to 16-3/4 in.

SL-17/24D

16-3/4 to 23-3/4 in.

SL-24D

23-3/4 in.

SL-36D

35-3/4 in.

SL-48D

47-3/4 in.

Содержание EHS3633

Страница 1: ...D THIS MANUAL CAUTION Important operating and maintenance instructions included Leave this manual with party responsible for use and operation Read understand and follow these instructions for safe in...

Страница 2: ...iance can be found on the rating plate located in the control area of the appliance Congratulations XXXX CERTIFIED FOR CANADA CERTIFI POUR LE CANADA Hearth Home Technologies Inc 1915 W Saunders Street...

Страница 3: ...ing Optional Hearth 23 8 Installing Vent Pipe 9 Gas Information A Fuel Conversion 27 B Gas Pressure 27 C Gas Connection 27 D High Altitude Installations 28 10 Electrical Information A Recommendation f...

Страница 4: ...fers to 15 U S Code USC 2063 stating Such certificate shall accompany the product or shall otherwise be furnished to any distributor or retailer to whom the product is delivered Some local building co...

Страница 5: ...at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size...

Страница 6: ...ver Electric drill and bits 1 4 in Plumb line Safety glasses Level Manometer Voltmeter Tape measure Non corrosive leak check solution Keep appliance dry Mold or rust may cause odors Water may damage c...

Страница 7: ...tions reflect typical installations and are FOR DESIGN PURPOSES ONLY Illustrations diagrams are not drawn to scale Actual installation may vary due to individual design preference Fire Risk Provide ad...

Страница 8: ...e plate and cantilever floor of the chase should be insulated Vapor and air infiltration barriers should be installed in the chase as per regional codes for the rest of the home Additionally in region...

Страница 9: ...urfaces extending full width and depth of appliance Do NOT install appliance directly on carpeting vinyl tile or any combustible material other than wood WARNING Model A Rough Opening Width B Rough Op...

Страница 10: ...191 mm min from fireplace opening to perpendicular wall B 48 in 1219 mm max Mantel Leg or Perpendicular Wall Top of Appliance Drywall A B Figure 3 4 Clearances to Mantel Legs or Wall Projections Accep...

Страница 11: ...tion or other materials away from vent pipe may cause fire Measure horizontal clearances from this surface Measure vertical clearances from this surface Figure 4 1 Clearances from Cap Surfaces see Fig...

Страница 12: ...gions Storm Collar Roof Flashing Figure 4 2 Minimum Height from Roof to Lowest Discharge Open ing A Gas Termination Wood or Fuel Oil Termination B 6 in 152 mm min 20 in 508 mm min Direct Vent Gas Wood...

Страница 13: ...on a minimum of 2 sides beneath the floor N Vertical clearance between two horizontal termination caps 12 in 30 cm minimum O Horizontal clearance between two horizontal termination caps 12 in 30 cm m...

Страница 14: ...zontal run and 8 1 2 in vertical run A length of straight pipe is allowed between two 45 elbows see Figure 5 1 ALL vent configuration specifications MUST be followed This product is tested and listed...

Страница 15: ...H measurement for each 45 elbow installed horizontally A maximum of three 90 elbows or six 45 elbows may be used in any vent configuration Some elbows may be installed horizontally See Figure 5 6 Elb...

Страница 16: ...allation Requirements for Two 45 Elbows Top Vent Horizontal Termination Top Vent Horizontal Termination Three Vertical Elbows See Figure 5 6 for information about installing elbows horizontally H1 V2...

Страница 17: ...act 3 ft 914 mm from the total horizontal measurement for each 90 elbow installed horizontally Subtract 1 1 2 ft 457 mm from the total horizontal measurement for each 45 elbow installed horizontally T...

Страница 18: ...Vent Vertical Termination Two Elbows Figure 5 7 Vertical Termination No Elbows 12 ft 3 66 m min 60 ft 18 29 m max Maximum horizontal run is 100 of vertical but cannot exceed 26 ft 7 92 m Figure 5 8 Ve...

Страница 19: ...ed 26 ft 7 92 m Figure 5 9 Vertical Termination Three Elbows some horizontal Note Subtract 3 ft 914 mm from the total horizontal measurement for each 90 elbow installed horizontally Subtract 1 1 2 ft...

Страница 20: ...ly required on one side and no heat shield is necessary If your local inspector requires the wall shield firestop on both sides of the wall then both wall shield firestops must have a heat shield atta...

Страница 21: ...irestop 3 fasteners per side Ceiling firestop installed below ceiling Ceiling firestop installed above ceiling Install attic insula tion shields before or after installation of vent system Figure 6 5...

Страница 22: ...iagram shows how to properly position level and se cure the appliance see Figure 7 1 Nailing tabs are pro vided to secure the appliance to the framing members Place the appliance into position Level t...

Страница 23: ...hearth over Apply 1 in 25mm diameter 1 4 in 6 mm thick pads of construction adhesive on 3 in 76 mm centers across the entire back side of the hearth See Figure 7 3 1 in 25 mm diameter 3 in 76 mm 3 in...

Страница 24: ...ting Collars To attach the first vent component to the starting collars of the appliance Lock the vent components into place by sliding the concen tric pipe sections with four 4 equally spaced interio...

Страница 25: ...ure the wall shield firestops with nails or screws The heat shields of the wall shield firestops MUST BE placed towards the top of the hole Continue the vent run through the wall shield firestops VENT...

Страница 26: ...H Min Ft Flat to 6 12 1 0 Over 6 12 to 7 12 1 25 Over 7 12 to 8 12 1 5 Over 8 12 to 9 12 2 0 Over 9 12 to 10 12 2 5 Over 10 12 to 11 12 3 25 Over 11 12 to 12 12 4 0 Over 12 12 to 14 12 5 0 Over 14 12...

Страница 27: ...ector are connected to the 1 2 in 13 mm control valve inlet If substituting for these components please consult local codes for compliance Note The gap between supply piping and gas access hole may be...

Страница 28: ...ion is complete all connections must be tightened and checked for leaks with a commercially available non corrosive leak check solution Be sure to rinse off all leak check solution following testing F...

Страница 29: ...Ignitor Button B Connecting to the Appliance Shock Risk Explosion Risk Do NOT wire 110V to valve Do NOT wire 110V to wall switch Incorrect wiring will damage millivolt values Incorrect wiring will ov...

Страница 30: ...place damaged wire with type 105 C rated wire Wire must have high temperature insulation WARNING Figure 10 2 Intellifire Pilot Ignition IPI Wiring Diagram Pilot Ignitor GAS VALVE To Burner Gas Inlet I...

Страница 31: ...to the outer shell Rotate the front of the assembly in while sliding the rear of the assembly forward and out of the retaining slot See Figure 10 4 Screw Out Figure 10 4 Remove Junction Box Assembly...

Страница 32: ...Figure 11 1 Clearances to Mantels or other Combustibles above Appliance 1 in 25 mm min to perpendicular wall A 7 1 2 in 191 mm min from fireplace opening to perpendicular wall B 48 in 1219 mm max Mant...

Страница 33: ...or cracks chips or scratches Do NOT strike slam or scratch glass Do NOT operate appliance with glass door removed cracked broken or scratched Replace glass door assembly as a complete assembly WARNING...

Страница 34: ...ize of rockwool on the burner pan so that the rockwool touches but does not cover the holes in the burner pan This will provide the glowing embers look It is not necessary to use the entire bag Save t...

Страница 35: ...approximately 1 in from the outside edge of the surround piece on top and side flanges of appliance See Figure 12 10 Mount left leg to appliance by holding back trim strips and engaging tabs in surro...

Страница 36: ...dge Tighten only the outside screw to temporarily hold surround in place Edges on surround top and surround leg may not match up at this time adjustments will be made later Hold right surround top clo...

Страница 37: ...her When the shutter ad justment handle is all the way down the air shutter is in the open position When the shutter adjustment handle is all the way up the air shutter is in the fully closed position...

Страница 38: ...ustment Ensure that there are no gas leaks Ensure that the glass is sealed and in the proper position Ensure that the flow of combustion and ventilation air is not obstructed front grilles and vent ca...

Страница 39: ...ppliance WARNING If you do not follow these instructions exactly a fire or explosion may result causing property damage personal injury or loss of life FOR YOUR SAFETY READ BEFORE LIGHTING 33631D C Us...

Страница 40: ...anying the appliance WARNING If you do not follow these instructions exactly a fire or explosion may result causing property damage personal injury or loss of life FOR YOUR SAFETY READ BEFORE LIGHTING...

Страница 41: ...mable materials in the vicinity of the appliance Do NOT use gasoline lantern fuel kerosene charcoal lighter fluid or similar liquids in this appliance Combustible materials may ignite WARNING Fire Ris...

Страница 42: ...copper lead Start the pilot and hold the valve knob in If the millivolt reading is less than 15mV replace the thermocouple B Defective valve If the thermocouple is producing more than 15 millivolts r...

Страница 43: ...y D Bad thermopile or thermocouple Replace if necessary E Improper vent cap installation Check for proper installation and freedom from debris or blockage 6 Glass soots A Flame impingement Adjust the...

Страница 44: ...pliance E Faulty module Turn ON OFF rocker switch or wall switch to OFF position Remove ignitor wire I from module Place ON OFF rocker switch or wall switch in ON position Hold ground wire about 3 16...

Страница 45: ...ll valve is open Verify that inlet pressure reading is within acceptable limits inlet pressure must not exceed 14 in w c B Ignitor gap is too large Verify that spark gap from ignitor to pilot hood is...

Страница 46: ...s control compartment Burner burner ports Risk of Fire Delayed ignition or explosion Exposure to combustion fumes Odors WARNING Handle glass assembly with care Note Clean glass after initial 3 4 hours...

Страница 47: ...epaint as necessary 2 Replace appliance if firebox has been perforated Burner ignition and operation 1 Verify burner is properly secured and aligned with pilot or ignitor 2 Clean off burner top inspec...

Страница 48: ...and clearances refer to Sec tion 3 10 7 8 in 276 mm 10 7 8 in 276 mm 17 1 8 in 435 mm 33 in 838 mm 35 1 2 in 902 mm 20 5 8 in 524 mm 33 1 2 in 851 mm 3 in 76 mm 6 1 2 in 165 mm 3 4 in 19 mm 8 in 203...

Страница 49: ...ngth SL 24D 24 in 610mm pipe length SL 36D 36 in 914mm pipe length SL 48D 48 in 1219mm pipe length SL 12 17D 12 in 17 in 305 432mm Adjustable pipe SL 17 24D 17 in 24 in 432 610mm Adjustable pipe SL 45...

Страница 50: ...installation 6 1 2 in For use on Intellifire appliances only SL SERIES 4049 036 Starter Elbow Supplied with appliance DVP 826 required to use PVK 80 with EHS3633 Pipe Effective Length Height SL 06D 5...

Страница 51: ...81 mm 8 1 8 in 206 mm SL HRC SS For use with EHS3633 EHS3633I EHS3633L EHS3633IL 10 7 8 in 276 mm 10 1 2 in 267 mm 3 87 Effective Length 5 3 4 to 8 3 8 in 146 to 213 mm 5 1 2 in 140 mm 8 3 8 in 213 mm...

Страница 52: ...52 Heatilator Eclipse 4049 300 Rev H 11 07 This page intentionally left blank...

Страница 53: ...11 07 53 C Service Parts List Exploded Parts Diagram Ecilpse DV Service Parts EHS3633 EHS3633I Beginning Manufacturing Date 1 07 Ending Manufacturing Date Active 20 21 19 1 2 3 4 5 6 7 8 9 10 11 11 1...

Страница 54: ...191 7 Surround Top Right 4049 157 8 Surround Cover Top 4049 174 9 Surround Cover Right 4049 172 10 Surround cover Left 4049 173 11 Surround Side 4049 156 12 Screen 4049 193 13 Top Face 4049 166 14 Bot...

Страница 55: ...Exploded Parts Diagram Eclipse DV Service Parts EHS3633 EHS3633I Beginning Manufacturing Date 1 1 07 Ending Manufacturing Date Active 1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 IPI Valve Assembly 1 2 3 4 5 6...

Страница 56: ...ess Steel Flex Gas Line 15696B 15696B 4 Valve NG 30494 593 500 5 Pilot Assembly NG 2103 010 2090 012 6 Valve Bracket 4049 169 4049 169 7 Bulkhead Gasket 4021 429 4021 429 8 Bulkhead 4021 428 4021 428...

Страница 57: ...Heatilator Eclipse 4049 300 Rev H 11 07 57 D Optional Components Hearth EHS...

Страница 58: ...58 Heatilator Eclipse 4049 300 Rev H 11 07 This page intentionally left blank...

Страница 59: ...adequate ventilation or drafting caused by tight sealing construction of the structure air handling devices such as exhaust fans or forced air furnaces or other causes 5 use of fuels other than those...

Страница 60: ...0162 5016609 5076254 5113843 5191877 5218953 5263471 5328356 5341794 5347983 5429495 5452708 5542407 5601073 5613487 5647340 5688568 5762062 5775408 5890485 5931661 5941237 5947112 5996575 6006743 601...

Отзывы: