Heatilator • CST42A • 4012-012 Rev J • 08/06
22
Termination Cap
Storm Collar
Slope Downward
Turn-down
Drip Edge
Chase
(Chimney)
2 in. (51 mm) Collar
on Chase Top
Caulk
.018 (26 ga) min.
Galvanized
Chase Top
Figure 6.4 Chase Top Construction
Install the Chimney Air Kit (required in Canada):
When installing the chimney air kit, follow the instructions
provided with this accessory.
B. Chase Top
A metal chase top is required to seal the top of the chase
around the chimney pipe. The top should include a turn-
down and drip edge to prevent water from seeping into the
chase. Provide a 1/8 in. (3 mm) gap around the
fl
ue pipe
and slope the top downward away from the penetration. See
Figure 6.4.
• All seams must be caulked to prevent leaks.
• A chase installation must use a chase top. Chase tops
are available from your Heatilator dealer or may be
fi
eld
constructed.
• Attach the chase top to the top of the chase.
2 in. (51 mm) min. collar
6 in. (152mm) min.
2 in. (51 mm) min.
Storm Collar
Flashing Collar
Minimum 1-1/2 in. (38 mm) overlap of cap over pipe
Figure 6.5 Installing a TR444 Round Termination Cap
Storm Collar
Flashing Collar
Top of Pipe
14-1/2 in. (368mm) max.
1-1/2 in. (38 mm) min.
overlap
2 in. (51 mm) min.
Figure 6.6 Installing a TR442 Round Telescoping Termination Cap
Note:
To protect against the effect of corrosion on those
parts exposed to the weather, the termination cap can be
painted with a rust-resistant paint.
Fire Risk
• The minimum overlap of cap to pipe
MUST be met or chimney may separate
from cap.
Separation allows sparks, heat and embers
to escape.
WARNING
C. Install the Termination Cap
•
For installations utilizing a TR442 Round Telescoping
Termination Cap, the uppermost chimney section must be
below the top of the chase top, but not more than 14-1/2 in.
(368 mm) below the top of the chase top. Minimum overlap
of chimney and termination cap must be 1-1/2 in. (38 mm).
See Figure 6.6.
•
Install the chimney sections up through the chase
enclosure. When using a TR444 Round Termination
Cap, the uppermost top section of pipe must extend 6 in.
(152 mm) above the top of the
fl
ashing collar to allow
installation of the storm collar and termination cap. See
Figure 6.5.