![heatco EMA Series Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/heatco/ema-series/ema-series_installation-operation-and-maintenance-instructions_2116238007.webp)
7
Application Guidelines
Parallel installations are acceptable with all configurations.
Heaters may be installed in series
when applicable
(Limited to Two (2) in series).
Note that higher air
side pressure drop is expected when installing high efficiency (90%+) in series.
IV. Duct Installation
Duct work should be sized to fit flanged opening on the duct furnace. Ductwork should be mechanically fastened
to heating unit. Joints should be sealed with high temperature silicone caulking or high temperature tape to
prevent leakage of circulating air. All duct connections MUST be weather tight to prevent rain and snow from
entering ductwork. Support all ductwork securely. DO NOT rely solely on heating unit duct connections for
support.
Provide removable access panels in ductwork immediately upstream and downstream of duct furnace to allow for
inspection of the heat exchanger. These openings should be large enough to observe smoke or reflected light
inside the casing to inspect heat exchanger for leaks, and to check for hot spots on the heat exchanger due to
poor air distribution or insufficient air volume. Attach covers so as to prevent air leakage. See Figure 3.
WARNING !
Be sure the furnace/airflow configuration selected is appropriate for application
based on entering air temperature. Failure to install unit with proper airflow
direction may result in property damage, personal injury or death.
Duct
Furnace
Duct
Furnace
Airflow
Top View
OK