background image

The zone control panel is for indoor use only and must be installed by a qualifi ed installer/service technician.  

This product must be installed and operated in strict accordance with the terms set out in this manual and in 

accordance with the relevant requirements of the Local Authority Having Jurisdiction.  Failure to comply will result 

in a void of warranty, and may also result in property damage, serious injury, or death.

Prior to commencing installation of this panel it is necessary to read and understand all sections of this manual. 

The symbols below are used throughout this document to ensure proper operation of the panel, and your safety.  

Please pay attention to these symbols.

In order to avoid injury or death, switch off  the power to the panel prior to 

inspecting or making connections to the terminal strip.

Warning

Possible Hazard

Warning

Live Power

Warning

Hot Pipes

Warning

Treated Water

SSP-SSASL

Installation, Operation, and Maintenance Manual

SSP-SSASL Manual

®

Link

Heat

2

Warnings

Servicing

Product Safety Information

Содержание StatLink SSP Series

Страница 1: ...R C 3 4 W R C W R C W R C W R C W R C W R C 5 6 7 8 2 1 2 1 2 1 2 1 2 1 Pump Boiler Dry Contacts R R R C Reset 24Vac 8 Zone Wired Module 40318 0 15 NC NO Delay Off min Actuator LIVE GROUND NEUTRAL CAU...

Страница 2: ......

Страница 3: ...ifications previously agreed upon HeatLink Group Inc and the Purchaser All trademarks in this material are property of the respective companies HeatLink and the HeatLink logotype are trademarks of Hea...

Страница 4: ...r death Prior to commencing installation of this panel it is necessary to read and understand all sections of this manual The symbols below are used throughout this document to ensure proper operation...

Страница 5: ...ected and switches on the pump and the boiler SSP SSASL Installation Operation and Maintenance Manual SSP SSASL Manual Link Heat 3 Function FUSE 2 1 W R C W R C 3 4 W R C W R C W R C W R C W R C W R C...

Страница 6: ...rd FUSE 2 1 R W R C 3 W R C W R C 1 2 1 1 1 R R R C 24Vac Step 7 Push the actuator wires into the round holes at the bottom of the module Clip wires into the strain relief You can connect up to four a...

Страница 7: ...ng them and reinserting them as necessary Step 11 Ensure the fuse 4 A 5x20mm F4AH250VP is in place remove fuse holder to verify Step 12 Replace the plastic cover Step 13 Switch on mains power supply t...

Страница 8: ...LK RED BLK Thermostat Wiring 24V low voltage power may be supplied to the thermostat Wiring of thermostat should be done by qualified electrician and should meet local codes and jurisdictions Wiring t...

Страница 9: ...Y CONTRACTOR FIELD WIRING BY CONTRACTOR FIELD WIRING BY CONTRACTOR GRN RED BLU OPTIONAL ACTUATORS BLK BLK RED BLK 1 3 2 4 Step 1 When power is provided to the 110V terminals 1 connected to the StatLin...

Страница 10: ...r similar device to verify The StatLink module or circulator may be defective A qualified electrician should verify 24V power is supplied to the thermostats and actuator The 24V transformer may have f...

Страница 11: ...Heat Link www heatlink com SSP SSASL Installation Operation and Maintenance Manual...

Страница 12: ...32 Fax 1 866 450 1155 China Distributed by Cathay Links International Phone 852 25693213 Fax 852 25359271 Ireland Distributed by Jamoni Ltd Phone 057 932 4062 Fax 057 932 4063 Freephone 1800 311338 M...

Отзывы: