background image

SSP-SSASL

Installation, Operation, and Maintenance Manual

SSP-SSASL Manual

®

Link

Heat

5

Switch

Function

Diagram

Actuator 

Type

Selects the type of actuator being 

used - Normally Closed “NC” 

(HeatLink default), or Normally 

Open “NO”.

Note: The actuator and 

thermostat settings must be the 

same.

0

15

NC NO

Delay

Off

min

Actuator

0

15

NC NO

Delay

Off

min

Actuator

Boiler Off 

Delay

Sets the delay time for switching 

the boiler off to 0 minutes 

(default), or 15 minutes. 

The pump/boiler on delay and 

the pump off delay are fixed at 3 

minutes. 

0

15

NC NO

Delay

Off

min

Actuator

0

15

NC NO

Delay

Off

min

Actuator

FUSE

2

1

W

R C

W

R C

3

4

W

R C

W

R C

W

R C

W

R C

W

R C

W

R C

5

6

7

8

2

1

2

1

2

1

2

1

2

1

Pump

Boiler

Dry Contacts

R

R

R

C

Reset

24Vac

8 Zone Wired Module

40318

0

15

NC NO

Delay

Off

min

Actuator

FUSE

2

1

W

R C

W

R C

3

4

W

R C

W

R C

W

R C

W

R C

W

R C

W

R C

5

6

7

8

2

1

2

1

2

1

2

1

2

1

Pump

Boiler

Dry Contacts

R

R

R

C

Reset

24Vac

8 Zone Wired Module

40318

0

15

NC NO

Delay

Off

min

Actuator

FUSE

2

1

W

R C

W

R C

3

4

W

R C

W

R C

W

R C

W

R C

W

R C

W

R C

5

6

7

8

2

1

2

1

2

1

2

1

2

1

Pump

Boiler

Dry Contacts

R

R

R

C

Reset

24Vac

8 Zone Wired Module

40318

0

15

NC NO

Delay

Off

min

Actuator

Step 10 

Set the actuator and boiler delay jumpers at the top right 

of the  module by carefully removing them, and reinserting 

them as necessary:

Step 11 

Ensure the fuse (4 A 5x20mm F4AH250VP) is in place 

(remove fuse holder to verify).

Step 12 

Replace the plastic cover.

Step 13 

Switch on mains power supply to the unit. The red LED 

comes on.

Note: the reset button to the right of the boiler delay jumpers. 

Using a suitable tool, press this button at any time to power 

cycle the module.

LED Indicators

Power

red

40318 is supplied with 24Vac

Zone 1 Actuator(s)

green

Demand from zone 1 thermostat: actuator open

Zone 2 Actuator(s)

green

Demand from zone 2 thermostat: actuator open

Zone 3 Actuator(s)

green

Demand from zone 3 thermostat: actuator open

Zone 4 Actuator(s)

green

Demand from zone 4 thermostat: actuator open

Zone 5 Actuator(s)

green

Demand from zone 5 thermostat: actuator open

Zone 6 Actuator(s)

green

Demand from zone 6 thermostat: actuator open

Zone 7 Actuator(s)

green

Demand from zone 7 thermostat: actuator open

Zone 8 Actuator(s)

green

Demand from zone 8 thermostat: actuator open

Pump

red

Pump is on

Boiler

red

Boiler is on

FUSE

2

1

W

R C

W

R C

3

4

W

R C

W

R C

W

R C

W

R C

W

R C

W

R C

5

6

7

8

2

1

2

1

2

1

2

1

2

1

Pump

Boiler

Dry Contacts

R

R

R

C

Reset

24Vac

8 Zone Wired Module

40318

0

15

NC NO

Delay

Off

min

Actuator

FUSE

2

1

W

R C

W

R C

3

4

W

R C

W

R C

W

R C

W

R C

W

R C

W

R C

5

6

7

8

2

1

2

1

2

1

2

1

2

1

Pump

Boiler

Dry Contacts

R

R

R

C

Reset

24Vac

8 Zone Wired Module

40318

0

15

NC NO

Delay

Off

min

Actuator

Содержание StatLink SSP Series

Страница 1: ...R C 3 4 W R C W R C W R C W R C W R C W R C 5 6 7 8 2 1 2 1 2 1 2 1 2 1 Pump Boiler Dry Contacts R R R C Reset 24Vac 8 Zone Wired Module 40318 0 15 NC NO Delay Off min Actuator LIVE GROUND NEUTRAL CAU...

Страница 2: ......

Страница 3: ...ifications previously agreed upon HeatLink Group Inc and the Purchaser All trademarks in this material are property of the respective companies HeatLink and the HeatLink logotype are trademarks of Hea...

Страница 4: ...r death Prior to commencing installation of this panel it is necessary to read and understand all sections of this manual The symbols below are used throughout this document to ensure proper operation...

Страница 5: ...ected and switches on the pump and the boiler SSP SSASL Installation Operation and Maintenance Manual SSP SSASL Manual Link Heat 3 Function FUSE 2 1 W R C W R C 3 4 W R C W R C W R C W R C W R C W R C...

Страница 6: ...rd FUSE 2 1 R W R C 3 W R C W R C 1 2 1 1 1 R R R C 24Vac Step 7 Push the actuator wires into the round holes at the bottom of the module Clip wires into the strain relief You can connect up to four a...

Страница 7: ...ng them and reinserting them as necessary Step 11 Ensure the fuse 4 A 5x20mm F4AH250VP is in place remove fuse holder to verify Step 12 Replace the plastic cover Step 13 Switch on mains power supply t...

Страница 8: ...LK RED BLK Thermostat Wiring 24V low voltage power may be supplied to the thermostat Wiring of thermostat should be done by qualified electrician and should meet local codes and jurisdictions Wiring t...

Страница 9: ...Y CONTRACTOR FIELD WIRING BY CONTRACTOR FIELD WIRING BY CONTRACTOR GRN RED BLU OPTIONAL ACTUATORS BLK BLK RED BLK 1 3 2 4 Step 1 When power is provided to the 110V terminals 1 connected to the StatLin...

Страница 10: ...r similar device to verify The StatLink module or circulator may be defective A qualified electrician should verify 24V power is supplied to the thermostats and actuator The 24V transformer may have f...

Страница 11: ...Heat Link www heatlink com SSP SSASL Installation Operation and Maintenance Manual...

Страница 12: ...32 Fax 1 866 450 1155 China Distributed by Cathay Links International Phone 852 25693213 Fax 852 25359271 Ireland Distributed by Jamoni Ltd Phone 057 932 4062 Fax 057 932 4063 Freephone 1800 311338 M...

Отзывы: