![Heat Link ELBP TS Series Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/heat-link/elbp-ts-series/elbp-ts-series_installation-operation-and-maintenance-manual_2115892008.webp)
7
ELBPxxTSxx
Installation, Operation, and Maintenance Manual
L6ELBPxxTSx 2022 DRAFT
®
Link
Heat
Prior to mounting the panel, ensure the wall is capable of supporting the weight of the panel, and that the
required 110V & 240V wiring is available at the installation location. See page xx for wiring details.
The top of the panel should be a minimum of 5 feet from the floor, with sufficient space left at the bottom for
required piping.
Step 1
Using a level at the minimum height of
5 feet, draw a straight line on the wall.
Step 2
Mark stud locations. If the panel
cannot be secured directly to the studs,
a backing board may be needed to
properly install the panel.
Step 3
Screw three of the supplied mounting
screws into the studs or backing board
3" from the desired height, 6" and 16"
apart (see diagram).
Step 4
Lift and place the panel onto the
mounting screws using the keyhole
slots.
Step 5
Screw the remaining mounting screws
into place, and tighten all screws.
Step 6
Refer to piping hookup, fill and
purge, and wiring instructions before
replacing the cover.
Panel Mounting
Panel Installation