![Heat Link ELBP TS Series Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/heat-link/elbp-ts-series/elbp-ts-series_installation-operation-and-maintenance-manual_2115892012.webp)
11
ELBPxxTSxx
Installation, Operation, and Maintenance Manual
L6ELBPxxTSx 2022 DRAFT
®
Link
Heat
WARNING!!!
Consult Manual Before Use
AVERTISSEMENT!!!
Consulter le
manual avant l’usage
HeatLink Group Inc.
4603E - 13th Street NE
Calgary, Alberta, Canada
T2E 6M3
Phone: (403) 250-3432
Fax: (403) 250-1155
www.heatlinkgroup.com
Conforms to Std CAN/CSA C22.2 No. 14
Conforms to Standard UL 508
MADE IN CANADA
MODEL #: ELBP50TS7
D.O.M: Nov 12, 2013
Max Pres: 125psi/862kPa
Volts: 120/24 VAC
Serial #: XXX-XXXX
Phase/Freq: 1/60 Cycles
Max Temp: 100C/212F
Amps: Maximum 15
3189472
SOME UNION NUTS MAY
BECOME LOOSE
AND CONSEQUENTLY
LEAK THROUGH
TRANSPORTATION
VIBRATION AND
HANDLING. DO NOT
OVERTIGHTEN UNION NUTS
WHEN CORRECTING THIS.
Any alterations to
electrical wiring and
controls renders warranty
null & void.
Installation must conform
to local codes. Check
valve(s) if required are the
installers responsibility.
Before servicing,
disconnect power
supply
M A D E I N C A N A D A
CAUTION
DO NOT
PLUG!
PRESSURE
RELIEF
VALVE
This pipe should
be extended to
within 6 inches of
the floor by the
installer.
LIVE
GR
OUND
NEUTRAL
CAUTION 115 VOLTS ONLY
FUSE
2
1
W
R
C
W
R
C
3
4
W
R
C
W
R
C
W
R
C
W
R
C
W
R
C
W
R
C
5
6
7
8
2
1
2
1
2
1
2
1
2
1
Pump
Boiler
Dry Contacts
RR
R
C
Reset
24V
ac
8 Zone W
ired Module
40318
0
15
NC
NO
Delay O
ff
min
Actuator
A
B
C
D
E
F
G
H
Purge Hose
(not included)
Fill Hose
(not included)
Flow Direction
indicator
Step 12
Once each loop has been filled, close all supply and return manifold valves.
Step 13
Open valves F, G, H.
Step 14
Watch the purge hose in the pail until you observe a steady stream of water (no air or spitting).
Step 15
Open valve J.
Step 16
Close valve C.
Step 17
Open all Supply D and Return E
manifold valves; fill the system to
the required operating pressure.
Step 18
Close valve A.
Step 19
Remove plug from B.
Step 20
Check for leaks at connections. If
any leaks are found, tighten the
connection (using a backup wrench
on SS & brass connections) slowly
until leak stops.
Do Not Overtighten.