TECH 5.1

1 Circuit (Fully Modulating Floor Heating)  

Application:

 4-Way Mixing

Cast iron high mass boiler c/w  3 circuits

(one low temp. circuit - fully automatic modulating water temp for floor heating.)

Note:

•  Air vents, expansion tanks, pressure relief valves etc. For boiler as per local codes.

•  Drawings are for HeatLink

®

 suggested system layout only. User must determine if system layout will work for their particular application!

•  Use isolation ball valves for all circuits and components.

Control Sequence:

•  Indoor/outdoor control unit provides primary control for the HeatLink

®

 radiant floor system.  By correlating outside air temperature, supply wa

-

ter temp. & (optional) room temperature the control unit then activates the 4-way mixing valve motor which in turn modulates the supply water 

temperature to the floor.  Secondary floor heating control is provided by individual room thermostats operating zone drive motors.  For the forced 

air system the zone thermostats will open their respective zone valve and in turn activate the fan coil. (See ELECT 1.2 & 1.3) (For rough-in wiring 

instructions using StatLink

®

 controls see ELECT 1.8 & 1.9)

•  Boiler to fire either: 1) Independently on its own operating controls or 2) By activation through a relay of the indoor/outdoor controls. APPLICATION 

TO USE OPTION (____).

•  Primary pump  (P-2) to be wired through a relay in series with the thermostats of the fan coil as well as the indoor/outdoor controller. (Some boilers 

may have an internal relay which can be used to bring on primary pump on call for heat.) (see ELECT 5.3a & ELECT 5.3b)

•  Pumps (P-1, P-2, P-3) to be wired directly with their own disconnect switches. System pumps P-1 & P-3 to operate either: 

  1) Continually or  2) By activation through a relay of the

 

indoor/outdoor plus StatLink

®

 controls (see ELECT 5.3a & ELECT 5.3b).

  FOR THIS PARTICULAR APPLICATION P-1 AND P-3 TO OPERATE AS PER OPTION (_____).

P-1

Temperature

Gauge

Supply

Sensor

4 Way Mixing Valve

Mixing Valve Motor

Indoor/Outdoor

Controller

Outdoor

Sensor

(Note: The manifold at the highest location

should be equipped with an air vent)

(Optional pressure activated bypass

valve required if multiple thermostats

and zone motors are used)

1/2" Water Make Up

Back

Flow

Preventer

Expansion

Tank

High

Limit

Aquastat

Boiler

P-2

Drain

Cock

Manifold 2

Manifold 1

Install ball valves at all manifolds

(Allow spacing for future zone valve!)

Optional room thermostat & zone motors

(see ELECT 1.2-1.3 for rough in instruction)

Return/supply tie-in to be maximum

4 pipe diameters apart.

Auto Float

air vent

Optional

Flow Balancing

Globe Valve

if manifolds

are far apart.

Sidestream

Filter

Содержание 31360

Страница 1: ...n R Cls 11 C Powered Output 7 8 L N Sys Pmp N 1 Mixing Demand 2 3 4 5 6 Power 12 13 14 15 16 17 Do not apply power UnO Sw Com Boil Mix Com Out Item Motor Speed Open Close Mixing Demand Input Timer Opt...

Страница 2: ...4 StatLink Controls Activating Circuits plus SnowMelt Controller Pg 34 35 TECH 5 5 4 Circuit Mod Fl Ht plus Fan Coil IFHWH Secondary Ht Exchanger Pg 36 ELECT 5 5 StatLink Activating Low Temp plus Inde...

Страница 3: ...then show the word ADJUST in the top right corner Then select the desired item using the Item button Finally use the Up and or Down button to make the adjustment To exit the ADJUST menu either select...

Страница 4: ...unt of heat lost by a building changes depending on the outdoor air temperature The amount of heat supplied by the heating system must be equal to the amount of heat being lost in the building If the...

Страница 5: ...owever the control does not operate the heating system to satisfy this demand If the control is in setpoint mode the WWSD feature is not functional 12 13 Timer Switch UnO Sw Com Floating Action A 24V...

Страница 6: ...oints to establish the rate at which the mix supply water temperature is to be increased for every degree that the outdoor air temperature falls The starting point of the reset ratio is fixed at 70 F...

Страница 7: ...he MIN segment will be displayed in the LCD when either the MIX TARGET or MIX temperature is being viewed Mix Target Temperature MIX TARGET When used as a mixing reset control the MIX TARGET temperatu...

Страница 8: ...whenever there is a mixing demand and the Stk 31360 is not in WWSD The system pump segment is displayed in the LCD After the mixing demand has been satisfied the Stk 31360 continues to operate the sys...

Страница 9: ...tant velocity by the fan or either a fan or blower Air is forced across the coil at a constant velocity by the fan or blower and is then delivered into the building space Default values MIX DSGN 190 F...

Страница 10: ...ual to the original MIX TARGET This minimizes overheating of the zone while the control is operating at the MIX MIN temperature Warm Weather Shut Down WWSD OCC UNOCC When the outdoor air temperature r...

Страница 11: ...le contact allows the boiler to ignite and operate at the boiler s operator setting The control closes the Boiler Enable contact when the position of the mixing valve exceeds 30 The Boiler Enable cont...

Страница 12: ...Note The boiler pump should not be operated by the boiler s aquastat as this may lead to improper cycling of the boiler because of inconsistent flow past the boiler return sensor Boiler return sensor...

Страница 13: ...k Boiler Universal Sensor Stk 30071 and HeatLink Mixing Universal Sensor Stk 30071 according to the instructions in the 10K Sensors L630070 and run the wiring back to the control If an HeatLink Indoor...

Страница 14: ...of the actuating motor and R Cls 10 is connected to the close terminal of the actuating motor C 11 is then connected to the common terminal of the actuating motor 3 4 Power Sys Pmp 5 6 N 120 V ac L N...

Страница 15: ...Boil 14 15 Mix Test The Power Supply Make sure exposed wires and bare terminals are not in contact with other wires or grounded surfaces Turn on the power and measure the voltage between the Power L...

Страница 16: ...s The terminal blocks should snap firmly into place Install the supplied safety dividers between the unpowered sensor inputs and the powered 120 V ac or 24 V ac wiring chambers Apply power to the cont...

Страница 17: ...oor design temperature The OUTDR DSGN setting is set to the typical coldest temperature of the year ADJUST ROOM F OCC The ROOM OCC adjustment is the first item displayed Use the Up or Down button to s...

Страница 18: ...Up or Down button to set the scale to F or C ADJUST TARGET MIX F Press and release the Item button to advance to the MIX TARGET adjustment Use the Up or Down button to select the desired temperature...

Страница 19: ...t European version only Mix Current mixed supply water temperature as measured by the mixing sensor Mix Target Target mixed supply is the temperature the control is currently trying to maintain at the...

Страница 20: ...lation for the heating system OUTDR DSGN OFF European version only Mix Design The design supply water temperature used in the heatloss calculation for the heating system OUTDR DSGN OFF Mix Maximum The...

Страница 21: ...pressed the test light is turned on The individual outputs and relays are tested in the following test sequence T est not testing testing testing paused off red red Test Sequence Each step in the test...

Страница 22: ...overlooked however it can often save hours of time in troubleshooting a system Note flow directions in the system paying close attention to the location of pumps check valves pressure bypass valves an...

Страница 23: ...upply sensor due to a short circuit In this case the control will operate the mixing valve at a fixed output as long as there is a mixing demand Locate and repair the problem as described in 10K Senso...

Страница 24: ...ependently on its own operating controls or 2 By activation through a relay of the indoor outdoor controls APPLICATION TO USE OPTION ____ Primary pump P 2 to be wired through a relay in series with th...

Страница 25: ...s of each particular control chosen In all cases manufacturer equipment schematics will take precedence over HeatLink electrical schematics All wiring as per applicable electrical codes 2 4 2 2 2 2 2...

Страница 26: ...ry pump P 2 to be wired in series with water heater aquastat 24v wiring and zone valve see elect 5 2 For schematic Aquastat to be set at a maximum of 130 f to prevent scalding Pumps P 1 P 2 to be wire...

Страница 27: ...er 31360 Boiler Primary Pump P 2 IF Aquastat IFHWH Relay R 1 P 3 Outdoor Sensor Optional Boiler Return Sensor System Pump P 1 Class II Transformer Supply Sensor Relay SLR 2 46151 Zone Thermostats Clas...

Страница 28: ...tly on its own operating controls or 2 By activation through a relay of the indoor outdoor controls APPLICATION TO USE OPTION ____ Primary pump P 2 to be wired through a relay in series with the therm...

Страница 29: ...This page is intentionally blank...

Страница 30: ...and the primary P 2 and system P 3 pump Note DrawingsareforHeatLink suggestedelectricalschematicsonly Usermustdetermineifelectricalschematicwillworkfortheirparticularapplication User must also confirm...

Страница 31: ...P 3 Boiler Contacts Mix Supply Sensor Boiler Sensor Optional Unoccupied Switch Outdoor Sensor R 1 DHW Aquastat SPST 24V 24 Vac Class II Transformer R1 R2 45012 24 Vac 2pole Max Pump 1 4 HP 110Vac Max...

Страница 32: ...own operating controls or 2 By activation through a relay of the controllers APPLICATION TO USE OPTION ____ Primary pumps P 4 P 5 to be wired through a relay in series with the thermostats or aquastat...

Страница 33: ...This page is intentionally blank...

Страница 34: ...rmineifelectricalschematicwillworkfortheirparticularapplication User must also confirm all HeatLink schematics with manufacturer schematics of each particular control chosen In all cases manufacturer...

Страница 35: ...Power N L 22 Sys P1 4 Red 5 Blk Com 6 Blu 7 Yel 8 Brn Slab 9 Boil 10 Com 11 tN2 12 Mix Ret 13 Mix Sup 14 Com 15 Out Do not apply power Boiler Contacts Outdoor Sensor P 2 Snow Ice Detector Wiring as s...

Страница 36: ...y pump P 3 to be wired through a relay in series with the thermostats of the fan coil as well as the indoor outdoor controller Some boilers may have an internal relay which can be used to bring on pri...

Страница 37: ...This page is intentionally blank...

Страница 38: ...from DHW tank is controlled by StatLink which activates system pump P 4 no tie in to boiler required Note DrawingsareforHeatLink suggestedelectricalschematicsonly Usermustdetermineifelectricalschemat...

Страница 39: ...6 17 11 10 9 8 7 6 5 4 3 2 1 Uno Sw Boil Out Com Mix Com C Cls Mix Opn Mix Boiler N Sys Pump Pwr N Pwr L Mixing Demand 10 A 10 A DHW Boiler Contacts see SL2 Boiler Contacts 24V 24 Vac Class II Transfo...

Страница 40: ...is provided by the indoor outdoor control unit See ELECT 1 2 1 3 For rough in wiring instructions using StatLink controls see ELECT 1 8 1 9 Boilertofireeither 1 Independentlyonitsownoperatingcontrols...

Страница 41: ...er equipment schematics will take precedence over HeatLink electrical schematics All wiring as per applicable electrical codes 4 4 Boiler Primary Pump P 2 Outdoor Sensor Indoor Outdoor Controller 3136...

Страница 42: ...HeatLink Mixing Valve Reset Control Stk 31360 Link Heat www heatlinkgroup com HeatLink 42 User Notes...

Страница 43: ...HeatLink Mixing Valve Reset Control Stk 31360 HeatLink Link Heat 43 www heatlinkgroup com User Notes...

Страница 44: ...proved meets ICES FCC regulations for EMI FI Ambient conditions Indoor use only 32 to 102 F 0 to 39 C 90 RH noncondensing Altitude 2000 m Installation Category II Pollution Category II Power supply 23...

Отзывы: