
Heat & Glo • RED60 • 2159-900 Rev. B • 12/09
35
Figure 7.26
INSTALLED
HORIZONTALLY
H
1
H
2
V
2
V
1
Top Vent - Vertical Termination
Venting with 3 elbows
Note
: Use DVP Series
components only.
V
1
+ V
2
Minimum
V
1
+ V
2
+ H
1
+ H
2
Maximum
2 ft.
610 mm
40 ft.
12.2 m
3 ft.
914 mm
50 ft.
15.2 m
4 ft.
1219 mm
70 ft.
21.3 m
V
1
+ V
2
+ H
1
+ H
2
= 70 ft. (21.3 m) Maximum
Note:
PVI-DVP can be located in any
position except V
1
.
Note:
Must have 24 inches minimum
vertical vent prior to attaching any
elbow to the appliance.
WARNING! Risk of fi re and burns!
DO NOT install PVI-DVP with the
access panel facing upward. Over-
heating may occur.