75
WTC
VX
WTC
VX
VX
VX
1-1/4"
(3,2 cm)
Screws
FINISH
Your eave trim is now installed.
PARTS REQUIRED:
12' x 20' EAVE TRIM
x2
2 x 6 x 96" (5,1 x 15,2 x 243,8 cm)
VX
2
3
Place
WTC
eave trim flush along edge of roof panel
(Fig. A)
and flush to gable trim.
BEGIN
Repeat installation on opposite side.
Screw through roof panel into
WTC
with 1-1/4" screws spaced evenly in a staggered pattern.
Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern.
Screw through roof panel intotrim with 1-1/4" screws spaced evenly in a staggered pattern.
**Last trim piece may need to be trimmed to fit**
Install
VX
flush to edge of roof panel and flush to installed eave trim
WTC
.
Install 2nd
VX
flush to edge of roof panel and flush to installed eave trim
VX
.
1
x82
1-1/4" (3,2 cm)
3" (7,6 cm)
x8
96"
(243,9 cm)
96"
(243,9 cm)
49-3/4"
(126,4 cm)
x2
2 x 6 x 49-3/4" (5,1 x 15,2 x 126,4 cm)
WTC
Flush
Fig. A
3"
(7,6 cm)
Screws
Evenly Spaced