Install next
48" x 96"
roof panel
flush to the installed panel and
flush at the peak
.
Secure panel with (1) 2" nail
in each corner.
Move to the opposite end.
Using the unattached end of
the panel as a lever, move the panel
side-to-side until the top corner is
flush to the peak
(Fig. B)
and there is
a 3/4" measurement on the rafter
(Fig A)
.
Finish securing panel with (1) 2" nail
in each corner.
Install a 47-7/
8" x 48"
roof panel flush
to the installed panel and flush at the
peak
(Fig. B)
.
Secure panel with (1) 2" nail
in each corner.
Move gable end rafter edge until
it is 1/2" from the roof panel
(Fig. C)
.
Finish securing panel with (1) 2" nail
in each corner.
3
4
5
PARTS REQUIRED:
12' x 20' ROOF PANELS
x22
2" (5,1 cm)
Fig. D
Maintain spacing between the center of the rafters at the lower edge of the panels
(Fig. D)
.
Secure panels with (1) 2" nail into each rafter, as shown.
Move to the top of the panel and keep spacing between the center of the rafters.
Secure panels with (1) 2" nail into each rafter.
47-7/8 x 48"
(121,6 x 121,9 cm)
x1
48 x 96"
(121,9 x 243,8 cm)
x1
NOTE:
Measurements from inside of gable panels
Move Gab
le
48" x
96"
47-7/8
" x 48"
Flush
Flush
Flush at
peak
Fig. B
2" nail
in each
corner
3/4"
(1,9 cm)
Gauge Block
Fig. A
2" (5,1 cm) Nails
1/2"
(1,2 cm)
Fig. C
Gable
End Rafter