background image

Modern Pergola

 

Installation Guide

heartlandpergolas.com  |  

5

c. 

Mount Fasteners - 3/8" hot 
dipped galvanized wedge 
or screw type anchors, 
minimum 2" embedment. 

d. 

Use composite shims 
as necessary to plumb 
mount. Tighten anchors.

c) Mount to Footing –  

For Paver Patios or 
Applications without 
a solid surface to 
fasten to (Figure 2c)

a. 

The main goal in this method is 
to discretely isolate the pergola 
posts from the patio area. This 
allows the patio to move up 

and down over the seasons 
while the pergola posts stay 
plumb and level. To do this 
properly, we recommend that 
the footing height be at least 
one paver thickness below the 
finished grade of the patio.

i. 

If there is an existing patio, 
you can simply remove 
blocks as necessary to form 
and pour footings to the 
height just below the existing 
patio surface. Use a concrete 
saw to cut the paver blocks 
to fit around the post once 
the forms are removed.

ii. 

If the patio is not yet 
installed, you MUST establish 
the desired patio surface 

height prior to 
forming and 
pouring your 
footings. The end 
goal is that the 
patio block will 
fit neatly around 
the post without 
fitting under it. 
This allows the 
patio to freely 
move up and 
down without 
squeezing or 
crushing parts 
of the pergola 
post. 

NOTE:

 It 

is common that 
the patio will 
have some slope. 

This is no problem. Simply 
set the top of your forms 
to follow the desired slope.  
The roof of the pergola 
can still be installed level.

b. 

Determine post locations 
and layout with strings 
and tape measures.

c. 

Minimum footing size = 
12" round or 10" square.

d. 

Dig footings to frost line, 
making sure to remove 
excess loose dirt from the 
bottom of the hole. In regions 
without a seasonal freeze 
thaw we recommend a 
minimum 36" footing depth. 

e. 

If the desired top of the 
footing needs to be above 
the ground around it, build, 
stake and level forms over 
your holes. Ensure your forms 
are installed square to patio 
or structure. It is often helpful 
to set string lines to double 
check the locations as well as 
desired height of the footings.

f. 

Fill holes with concrete to top 
of forms and trowel smooth

g. 

Once cured, attach post 
mounts to footings using 3/8" 
dia. hot dipped galvanized 
wedge or screw type anchors, 
minimum 2" embedment. 
Use composite shims 
as necessary to plumb 
mount. Tighten anchors.

PAVER

DIRT

FOOTING

GRAVEL

Footing to Frost Line

or 36" Minimum Depth

7"sq. Vinyl Post

Aluminum Post Mount

Aluminum Plate

½"x6" sq.

Concrete Anchor (4)

(not included)

Post Mount Standoff

Figure 2c

Содержание MODERN PERGOLA

Страница 1: ...When only the best will do MODERN PERGOLA INSTALLATION GUIDE ...

Страница 2: ...s in aluminum Pencil Speed Square String line If cutting to size is required Miter or Circular Saw with carbide blade cut slowly Sawhorses Additional tools for digging and setting pier type footings Hand diggers Auger Scrap Lumber for making forms Concrete stakes for holding forms Wheel barrow or small concrete mixer Shovel Trowel All fasteners for beams rafters purlin holders and purlins included...

Страница 3: ...d first remove the purlin holder and determine what trim length will allow you to cut between the holes This same measurement can be then applied to your post mount spacing You will trim each beam rafter and purlin holder in your kit by this exact size as you follow the installation steps b IMPORTANT Ensure posts are SQUARE with each other and or any adjoining structure NOTE If adding to an existi...

Страница 4: ...onstructed on a sound foundation For a compacted gravel base this means a minimum two courses below grade For a concrete base be sure to attach footing to base course with the recommended amount of landscape adhesive For construction of post we recommend either masonry or a high quality concrete product installed with a quality brand of landscape adhesive In the case of adhesive follow manufacture...

Страница 5: ...his allows the patio to freely move up and down without squeezing or crushing parts of the pergola post NOTE It is common that the patio will have some slope This is no problem Simply set the top of your forms to follow the desired slope The roof of the pergola can still be installed level b Determine post locations and layout with strings and tape measures c Minimum footing size 12 round or 10 sq...

Страница 6: ... of the Post Top Plate Cut your vinyl post 9 longer than this measurement a Make sure to cut from the correct end of the post This is the end without the routed slot for the beam b Remember your vinyl post will stick up 1 taller than the top of the 2x8 box beam to allow room to fit in the post cap c If the bottom of your post will be visible upon completion you will want to take extra time to ensu...

Страница 7: ...ms as per figure 5a d Using your driver and 12 extension fasten the beam to the Post Top Plate using the fasteners labeled beam to post e Set the beam attachment bracket in the inside corner of each beam intersection Figure 5b f Using a driver extension and the pre drilled holes in the post attach each bracket to post stiffener with fasteners labeled beam attachment bracket You DO NOT need to fill...

Страница 8: ...uirements determined by structure d Using a helper lift and set the beams into your posts and hangers ensuring to lap the beams as per figure 5c e Using your driver extension fasten the beam to the Post Top Plate using the fasteners provided f Set the beam attachment bracket in the inside corner of each beam intersection Figure 5b g Using a driver extension and the pre drilled holes in the post at...

Страница 9: ... rafter on the beam If your kit is attaching to a structure please note that these fasteners are NOT provided in your kit as they are determined by the type of structure you are attaching to d If your kit is attached to a structure you will want to transfer the same rafter spacing layout you used on your outside box beam to the ledger plate on the structure To ensure the rafter hangers are placed ...

Страница 10: ... sure to cut from the end labeled CUT END f Using the fasteners labeled inside purlin holders to rafter Install these 1 purlin holders on top of each rafter IMPORTANT a Be careful not to OVERTIGHTEN these screw as they can crack the purlin holder It is helpful to turn down the speed of your drill b Make sure purlin holes are angled the same direction as the outside purlin holder c Make sure that y...

Страница 11: ... into the holders until it is centered between the posts NOTE The purlin caps help guide the purlins into each of the holes It is helpful to have another person to assist with any purlins that get hung up during this process g Continue sliding purlins cap end first in to each hole until fully inserted h Insert the shorter last purlin into the last hole centering it between posts as you did the fir...

Страница 12: ... through the hole in the rafter hanger f Measure the clearance between the rafter hangers g Cut aluminum and vinyl 2x6 piece 1 8 shorter than the distance between hanger plates to ensure enough room to fit the 2x6 into place Test fit the 2x6 between the hangers trim if necessary h Once 2x6 is the proper length mark and drill a hole for the wire to come through the 2x6 i Slide skirts over each end ...

Отзывы: