22
PARTS REQUIRED:
DOOR
First, nail lower edge of panel to floor frame using 2" nails 6" apart.
Angle nail to hit floor frame
(Fig. B)
.
3
You have finished standing your BACK WALL.
FINISH
5
Secure side wall bottom plate to floor using 3" nails
(Fig. B)
.
4
2
3" (7,6 cm)
x12
2" (5,1 cm)
x25
BACK WALL INSTALLATION
DOOR
3" Nails into bottom plate.
3" (7,6 cm)
Screws x2
BEGIN
Stand backwall on floor.
It is important to secure the backwall in the following order.
ENSURE 4" MEASUREMENT IS AT TOP OF BACK WALL ASSEMBLY.
Center back wall assembly on the 144" floor dimension.
1
144"
(365
,8 c
m)
4"
(10,2 cm)
Nail 2" nails first.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. B
Use (2)
JDA
as a temporary brace. Level wall and
secure
JDA
with two 3" screws
(Fig. A)
.
x2
2 x 4 x 80-11/16" (5,1 x 10,2 x 204,9 cm)
JDA
3" (7,6 cm)
x2
Fig. A
JDA
TEMPORARY
Содержание 16826
Страница 2: ... This page intentionally left blank ...