
21
HBM: Business Document
6.3 Supply voltage
The transducer must be operated with a separated extra‐low voltage (supply
voltage 9…36 VDC).
7 Functional testing
You can check the functionality of the rotor and the stator from the LEDs on
the evaluation unit.
•
It is not allowed to extend or reduce the length of the connection
cable between rotor and evaluation unit!!!
•
Don’t lay cable parallel to high voltage and control cable. If this is not
avoidable, please let a minimum gap of 50cm and lay the cable inside a
steel tube.
•
Avoid transformer, motor, gate, thyristor circuits and similarly leakage
fields.
Important
•
Check the calibration signal specified on the type label or test protocol.
•
To obtain stable conditions, the measurement should be started or the
calibration signal should be activated only once the transducer has been
warming up for 15 minutes.
Содержание TJ1-S6
Страница 21: ...15 HBM Business Document Fig 5 6 Dimensions of the control unit...
Страница 28: ...22 HBM Business Document 8 Maintenance The torque transducer is maintenance free...
Страница 29: ...23 HBM Business Document 9 Dimensions of the stator antenna...
Страница 30: ...24 HBM Business Document 10 Dimensions of the rotor antenna...
Страница 31: ...25 HBM Business Document...