
9
HBM: Business Document
4. Clean the plane surfaces of the transducer flange and the counter flange.
For safe torque transfer, the faces must be clean and free from grease.
Use a piece of cloth or paper soaked in solvent. Make sure that no solvent
drips into the inside of the transducer and that the transmitter coils are not
damaged during cleaning.
5. Fasten the lifting equipment to the mounting eye bolt(s).
6. Carefully lift up the rotor and move it to the mounting position (see Fig 5.1).
5.6 Mounting the rotor
1. Prior to installation, clean the plane faces of the transducer flange
and the counter flange.
For safe torque transfer, the faces must be clean and free from grease.
Use a piece of cloth or paper soaked in solvent. When cleaning, make
sure that you do not damage the transmitter winding.
Important
If alternating loads are expected, use thread locker (medium strength,
e.g. LOCTITE No. 242) to glue the screws into the counter thread to
exclude loss of tightening stress due to screw slackening.
3. Fasten all screws with the specified torque.
4. Now remove the ring bolts and mounting ring(s).
Important
Keep them in a safe place for future dismounting.
Содержание TJ1-S6
Страница 21: ...15 HBM Business Document Fig 5 6 Dimensions of the control unit...
Страница 28: ...22 HBM Business Document 8 Maintenance The torque transducer is maintenance free...
Страница 29: ...23 HBM Business Document 9 Dimensions of the stator antenna...
Страница 30: ...24 HBM Business Document 10 Dimensions of the rotor antenna...
Страница 31: ...25 HBM Business Document...