Mounting
C16i
A05516_01_Y00_01
HBM: public
9
CAUTION
or
Position of rotation stop dowel pin:
Radially position open side!
The bore depth ensures correct fitting of the pin. Only one load introduction
part per load cell must be equipped with this pin. This load introduction part
must be mounted below the load cell to enable the dowel pin to engage into the
rotation stop recess (
). No pin must be introduced
into the bore on the upper load introduction part.
Tip
Please also refer to and comply with the special notes at the end of this chap
ter.
The areas or foundations below the lower load introduction part (for carrying off
the load) and above the upper load introduction part should be as even and
level as possible.
Practically drill the required borings for securing and fixing on the weighbridge
resp. tank and base plate before you mount the weighing platform. The dimen
sions for use with EPO3/50t and C16/EPU44A or C16/ZOU44A are as shown
in the dimensioned drawings in
Содержание C16i series
Страница 1: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 3: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 28: ...Dimensions 26 A05516_01_Y00_01 HBM public C16i...
Страница 29: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 56: ...Abmessungen 28 A05516_01_Y00_01 HBM public C16i...
Страница 57: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 83: ...Dimensions C16i A05516_01_Y00_01 HBM public 27...