Mounting
12
A05516_01_Y00_01
HBM: public
C16i
CAUTION
Align load cells vertically!
S
After finishing themounting procedure, once again check the perpendicular
mounting position for all the load cells, with the bridge swinging free and if
required,
lift the bridge
to correct the position. Exact mounting is an
important condition for accurate measurements and minimum corner
deviation.
S
Once the final perpendicular alignment of all load cells has been completed,
turn the eccentric washers towards the load introduction part and secure by
tightening the fixing screws.
S
Turn the flexible tube already mounted on the load cell down over the
compression pad and directly fix it on the compression pad using the tube
clip.
CAUTION
There is no warranty in case of un-lubricated compression pads and if the flexi
ble tube has not been mounted correctly!
Содержание C16i series
Страница 1: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 3: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 28: ...Dimensions 26 A05516_01_Y00_01 HBM public C16i...
Страница 29: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 56: ...Abmessungen 28 A05516_01_Y00_01 HBM public C16i...
Страница 57: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Fran ais C16i...
Страница 83: ...Dimensions C16i A05516_01_Y00_01 HBM public 27...