E-Glide 17” and 20” Electro Roto
Section VI
Owner’s Manual
Repair Manual
TABLE OF CONTENTS
A.
Main Switch and Electro Valve Switch
B.
Shunt Cord or Strain Reliever
C.
Electro Valve
D.
Bumper
E.
Motor Gear Unit
F.
Remove and Replace Handle Assembly (for Base Assembly)
A.
MAIN SWITCH OR ELECTRO VALVE SWITCH, REPLACE
(Disconnect from power source before making repairs.) (Refer to parts illustration of
Handle Assembly.)
1.
Remove the switch cover by removing two screws and lifting cover straight up.
2.
The Roto main switch and Electro Valve switch are now exposed and can be
replaced.
NOTE:
To avoid incorrectly connecting the wires on the new switch, hold the
old and new switch side by side before disconnecting any wires. Disconnect
one wire from the old switch, move it to the same terminal on the new switch,
and connect it securely. Move the second wire from the old switch to the new
switch, and so on.
3.
Reverse the above procedure to re-assemble.
NOTE:
The tab extension on the front side of the cover fits inside the top of the handle
tube. Take care not to damage the wire insulation when reassembling the cover.
B.
SHUNT CORD OR STRAIN RELIEF, REPLACE
(Disconnect from power source before making repairs.)
(Refer to parts illustration of Roto Handle Assembly. Figures 4 & 5)
1.
Remove the switch cover, as described in “A”.
2.
Disconnect the wires from the shunt cord, noting their color and position on
the switch.
NOTE:
The ground wire is connected to the grounding screw.
3.
Loosen the conduit nut and unscrew the strain reliever assembly from the switch
housing. You will have to pry the gripper teeth up to free the cord.
4.
Reverse the procedure to assemble.
13
To Order Parts Call 1-888-702-5326 - https://monsterfloorequipmentparts.com