A
B
C
D
E
F
G
H
I
81
24203 3207 0
E 07 07
EN
F
- Special procedure
Telescopic masts
4.1.2 - Loading by power lift truck
4.1.3 - Unloading by power lift truck
• While lifting, make sure that the load is evenly spread.
• Put down the machine.
4.1.4 - Loading by lifting
For : STAR 8 (STAR 22J) - STAR 10 (STAR 26J)
4.1.5 - Unloading by lifting
For : STAR 8 (STAR 22J)-STAR 10 (STAR 26J)
Hook the 4 slings on the 4 sling hooks.
• Ensure that the machine controls are in the OFF position.
• Use a sufficiently powerful lift truck.
• Move the forks apart.
• Place the forks in the positions indicated on the chassis.
• Place the forks well under the machine to ensure optimum
stability.
Use a lifting beam with 4 slings of sufficient strength.
Содержание STAR 10NG
Страница 2: ...2 24203 3207 0 E 07 07 EN Telescopic masts...
Страница 6: ...6 Operator manual...
Страница 18: ...18 24203 3207 0 E 07 07 EN Telescopic masts A Safety precautions...
Страница 22: ...22 24203 3207 0 E 07 07 EN Telescopic masts B Intervenor s responsibility...
Страница 104: ...10 24203 3207 0 E 07 07 EN H Intervention log Telescopic masts...