5 Operate
14
5
Operate
Preconditions:
The discharging power pack and the ionizing unit are connected and
installed as specified in the operator instructions.
NOTE:
After a fault, the reset pushbutton will start to flash with a delay of 3
seconds. The discharging power pack switches off the high voltage.
This can be triggered by:
• a drop of the high voltage at the HV output to below 4.2 kV~.
• a sparkover in the ionization system.
• a short circuit in the ionization system.
• overheating of the discharging power pack.
The discharging power pack can be reset by pressing the reset
pushbutton, external reset or switching off/on (mains switch or
mains voltage). If the error is caused by overheating (thermal circuit
breaker), the unit must be allowed to cool down for approx. 15
minutes. If the defect persists, refer to the following chapter
“Troubleshooting”. Refer page 18.
5.1
Normal operation
Operation of the discharging power pack without signalling line
K1 UL.
1. Switch on the discharging power pack using the mains switch
(A).
• The reset pushbutton will light up briefly to confirm.
• The mains switch will illuminate green to confirm.
• The discharging power pack is in operating mode.
NOTE:
Flashing of the reset button indicates an error. The discharging
power pack can be reset by pressing the reset pushbutton or
switching off/on (mains switch or mains voltage). If the error is
caused by overheating (thermal circuit breaker), the unit must be
allowed to cool down for approx. 15 minutes. If the defect persists,
refer to the following chapter “Troubleshooting”. Refer page 18.
Содержание 01.7924
Страница 2: ......
Страница 27: ......
Страница 28: ...EN 9 Sine UL v01gb docx V01 28 01 2021 D 0406 GB made by...