Maintenance
2L41C, 2M41, 2M41Z
84
HATZ
Operator’s Manual
Procedure — Removing the poly v belt
Step
Activity
1
Unscrew one cylinder screw (1) from the pulley (3).
2
Push back the tension pulley (2) and lock it using the cylinder
screw (1).
3
Unscrew the pulley (3).
4
Check the pulley (3) for broken or bent grooves.
5
Remove the poly v belt.
Overview — Checking the function of the switch-off unit of the belt monitor-
ing system
1
Tension pulley
2
Angle lever
3
Switch-off pin
Procedure — Checking the function of the switch-off unit of the belt moni-
toring system
Step
Activity
1
Release the piston with the tension pulley (1) by removing the
cylinder screw.
▪ The piston with the tension pulley is pushed out of the housing
by spring pressure.
▪ The angle lever (2) turns downward and releases the switch-
off pin (3).
▪ The switch-off pin (3) must emerge by spring force, or else the
machine will not switch off automatically if the belt tears.
2
If there is no reaction, please contact the nearest
HATZ service
station
.
Содержание 2L41C
Страница 2: ......