Q-Drive Installation, Operation, and Maintenance Manual
12 of 59
Ambient Temperature
32—131 °F (0—55 °C)
Ambient Humidity
0-95%
Storage/Shipping Environment
Ambient Temperature
-13—158 °F (-25—70 °C)
Site Preparation and Inspection
Before delivery, plan the site for the system to avoid problems and expense of delays.
Choose an orientation that maintains alignment with machinery, power, and lines.
Allow a minimum of 2 ft (0.6 m) of clearance space on all sides and 4 ft (1.2 m) on front side of
the system.
Allow a minimum of 3 ft(0.9 m) of clearance space above the system (above the hoods).
Allow space for a catch tray and for access to plugs and to remove the system.
Plan the location and depth of the anchor bolts.
Prepare the electrical requirements listed in the “Specifications” table.
At delivery, inspect the exterior packaging for any damage or any signs of tampering such
as broken security seals. As you unpack the system, look for unusual dents or punctures.
Use the following procedure if you find damage.
1. Note the damage or loss with the exact exception on the Proof of Delivery.
2. Take photographs of the damage to external packaging, evidence of tampering, or broken
security seals. Keep all damaged product and packaging for a possible inspection.
3. Go to the
Field Evaluation Report
and fill out the report within 14 days of delivery. Send the
report and following information to the Haskel regional sales office:
Photographs and a description of the damage.
Estimate of damage or loss.
Written Proof of Delivery with the noted exceptions.
Checklist
Surface is clean, dry, and level.
Space around and above the system is sufficient.
Location of holes for anchor bolts is correct.
No shipping damage.
Installation and Setup
CAUTION: Qualified electrical personnel must perform installation and maintenance.
Содержание Q-Drive QGD Series
Страница 1: ...88544_A Q Drive Installation Operation and Maintenance Manual Model QGD and QGT ...
Страница 57: ...Q Drive Installation Operation and Maintenance Manual 51 of 59 Points of Connections ...
Страница 58: ...Q Drive Installation Operation and Maintenance Manual 52 of 59 ...
Страница 59: ...Q Drive Installation Operation and Maintenance Manual 53 of 59 ...
Страница 60: ...Q Drive Installation Operation and Maintenance Manual 54 of 59 ...
Страница 61: ...Q Drive Installation Operation and Maintenance Manual 55 of 59 ...
Страница 62: ...Q Drive Installation Operation and Maintenance Manual 56 of 59 ...
Страница 66: ...Haskel International LLC 100 East Graham Place Burbank CA 91502 USA Telephone 818 843 4000 www haskel com ...