5
Installation of the Dual Channel Processor
Follow the instructions below to mount the Dual Channel Processor (DCP) on to your specific baler model and
type. The locations shown are on the right twine box (looking at the back of the baler). Mark and drill the four
3/8 (10mm) holes and install DCP with four 5/16 x 1 bolts, locks, flats and nuts. If your baler is not listed below
mount the DCP on the back of the twine box on the right side.
Baler Type
A
B
C
AGCO
Hesston
12"
(30cm)
3"
(70mm)
N/A
Challenger
12"
(30cm)
3"
(70mm)
N/A
Massey
Ferguson
12”
(30cm)
3”
(70mm)
N/A
Содержание 602A
Страница 22: ...22 Notes...