9
Installation of Gauge and Hose Manifold
Mount the gauge to the tank frame or the frame of the baler. If you mount the gauge to the baler, make sure it
does not interfere with any of the baler’s operation, or be in an area where it could be tripped over when
servicing the baler. Connect the hose between the pump and the gauge. Run the plumbing from the gauge to
the check valve on the spray shield. Connect the disconnect to the end of the hose from the gauge and to the
check valve. Secure to baler using the padded jiffy clips provided. Use hose clamps on all connections.
A.
Drill two 3/8” holes and mount pressure gauge to sheet metal. Bend the gauge bracket to adjust the
angle.
Placement of Spray Nozzle Assembly
Locate the spray shield holder (001-4704E2) and spray shield (001-4703GK). Center the spray
shield holder ov
er the rotor. Clamp the bracket and drill two 7/16” holes point F on figure 6. Secure
the bracket using two 3/8 x 1 1/4 bolts, locks, flats, and nuts. Tighten all hardware. Install the shield
and secure using the two lynch pins (008-4576).
F
001-4704E2
001-4703GK
Figure 18
Figure 16
Figure 17