15
Baler Display Integration
Case LB436HD & MY2021 and later LB4 Series New Holland 340/1290HD & MY2021 and later
Big Baler Series
Follow the steps below to setup the integration of the Moisture System into the baler display.
1. Select the baler Setup tab in the top right corner of the baler run screen.
2. Open the Diagnostics tab by pressing the (stethoscope icon) and select the System Information
tab.