1. Carry out the Loading procedure in the
reverse order for Unloading, taking
care at the beginning to deploy the
stabiliser legs to give a safe and
secure working platform.
7. Raise the stabiliser legs. Ready for
travel.
6.3
Unloading Procedure
6.4
Tipping Procedure
1. Extend the stabiliser legs to create a
secure tipping platform.
2. Ensure tipping hooks are raised &
extend telescopic cylinders until
tension is present on the chain
3. Ensure the correct tipping conditions
are present (Consult tipping guides
and environments checks).
4. Operate main arm, making sure
container is engaged with tipping
hooks
5. Return container to skiploader bed,
ensuring bin stops are as close to the
container as possible.
Содержание HS10T
Страница 13: ...8 0 Summary of Skiploader Operation...