background image

&

&

 

 

P-K SONIC

®

 / NURO

®

 GAS FIRED BOILER 

 

SC-1500/SC-2000 

SC-3000/SC-4000 

Natural Gas/Propane/Dual Fuel 

 

Part # 1004905978

 

 

 
 

C.S.A Design-Certified

 

Complies with ANSI Z21.13/CSA 4.9

 

Gas-Fired Low Pressure Steam and Hot Water Boilers

 

 
 

 
 

 
ASME Code, Section IV  
Certified by Patterson-Kelley

 

 

 

 
 

C.S.A Design-Certified

 

Complies with ANSI Z21.13/CSA 4.9

 

Gas-Fired Low Pressure Steam and Hot Water Boilers

 

 
 

 

Model Number:   

 

 
Serial Number:   

 

 

Start-Up Date:

 

 

Harsco Industrial, Patterson-Kelley

 

155 Burson Street

 

East Stroudsburg, PA 18301

 

Telephone: 570.476.7261

 

Toll Free: 877.728.5351

 

Fax: 570.476.7247 www.harscopk.com

 

 

Revised August 1, 2015

 

INSTALLATION 

& O W N E R’S 

MANUAL 

INSTALLATION 

& O W N E R’S 

MANUAL 

INSTALLATION 

& O W N E R’S 

MANUAL 

INSTALLATION 

& O W N E R’S 

MANUAL 

INSTALLATION 

& O W N E R’S 

MANUAL 

INSTALLATION 

& O W N E R’S 

MANUAL 

INSTALLATION 

& O W N E R’S 

MANUAL 

INSTALLATION 

& O W N E R’S 

MANUAL

 

 

 HARSCO Industrial, Patterson-Kelley 2015: All Rights Reserved. 

The information in this manual is the property of Harsco Industrial Patterson-Kelley. The descriptions and specifications contained in this manual were in 

effect at the time this manual was approved for publication. While Harsco Industrial Patterson-Kelley will continue to support earlier model boilers to 

within a reasonable time limit, we reserve the right to discontinue models and replacement parts at any time or change specifications or design without 

notice and without incurring any obligation. 

Содержание SC-1500

Страница 1: ...015 INSTALLATION O WNER S MANUAL INSTALLATION O WNER S MANUAL INSTALLATION O WNER S MANUAL INSTALLATION O WNER S MANUAL INSTALLATION O WNER S MANUAL INSTALLATION O WNER S MANUAL INSTALLATION O WNER S...

Страница 2: ...fic with adequate working space adequate clearances proper ventilation and lighting with a structure sufficiently strong and rigid to support the weight of the boiler all piping and accessories NOTICE...

Страница 3: ...le safety precautions If any of the provisions of this manual are not fully and completely understood contact Harsco Industrial Patterson Kelley Technical Service at 570 476 7261 or toll free at 877 7...

Страница 4: ...e main gas shutoff before servicing boiler Fire and Explosion Hazards Do not store or use gasoline or other flammable vapors or liquids in the vicinity of this or any other gas fired appliance Burn ha...

Страница 5: ...erations 9 2 4 5 Venting Materials for Flue Exhaust Systems 9 2 4 6 Required Clearances 10 2 4 6 1 Conventional Vent Systems Clearances 10 2 4 6 2 Direct Vent Sealed Combustion Systems Clearances 10 2...

Страница 6: ...fety System Test 31 3 10 2 Low Water Cut out Test 31 3 10 3 ManualReset High Temperature Limit Test 32 3 10 4 Gas Pressure Switch Tests 32 3 10 4 1 Low Gas Pressure Switch 32 3 10 4 2 High Gas Pressur...

Страница 7: ...48 6 1 3 Terminal Block Assignments Low Voltage TB1 Terminal Block 49 6 1 4 SC 3000 SC 4000 Control Transformer Diagrams 50 6 1 4 1 SC 3000 SC 4000 208 VAC Three Phase 60 Hertz 50 6 1 4 2 SC 3000 SC...

Страница 8: ...Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 APPENDIX D INSTALLATION AND QUICK REFERENCE 73 FUEL GAS SUPPLY 73 ELECTRICAL POWER SUPPLY 73 EXHAUST VENTING 73 H...

Страница 9: ...contained within or do not fully and completely understand the content please contact Harsco Industrial Patterson Kelley Technical Service at 570 476 7261 or toll free at 877 728 5351 1 3 HARSCO Indus...

Страница 10: ...Storage Prior to Installation If the boiler is not installed immediately it must be stored in a location adequately protected from the weather preferably indoors If this is not possible then it shoul...

Страница 11: ...rfaces the inches minimum clearances are shown in the illustration below Failure to provide adequate service clearances even with non combustible surfaces may present problems during routine maintenan...

Страница 12: ...stallation can allow toxic fumes to be released into living areas This may cause property damage injury or death 2 4 Inlet Air and Exhaust Venting Considerations 2 4 1 Applicable Codes and Standards U...

Страница 13: ...vertically Vent installations shall be in accordance with NFPA54 ANSI Z223 1 the National Fuel Gas Code or CAN CSA B149 1 the Natural Gas and Propane Installation Code or applicable provisions of the...

Страница 14: ...ft above any door operable window or gravity inlet into any building The bottom of the vent terminal shall be at least 12 in above grade or highest expected snow line if applicable Through the wall t...

Страница 15: ...med from combustion flue gases are acidic The condensate shall be drained in accordance with local code A condensate neutralizer may be required by local code 2 4 6 4 Flue Connection The connection fr...

Страница 16: ...can be manufactured for 208 240 VAC three phase 60 hertz electrical service OR 440 480VAC three phase 60 hertz electrical service The total operating amperage is indicated on the rating nameplate and...

Страница 17: ...60 hertz electrical service The SC 1500 and SC 2000 feature four dedicated power terminals on the High Voltage TB2 terminal block The illustration below shows the Low Voltage TB1 and High Voltage TB2...

Страница 18: ...HOT L2 Terminal 5 HOT L3 Terminal G GROUND The Main Power Connection Box features a Control Transformer which steps down two hot leads from the incoming three phase power in order to supply 110 120VAC...

Страница 19: ...safety devices This circuit is energized with 120VAC so the contacts on any auxiliary safety devices must be rated for minimum 120VAC The boiler ships with a factory installed jumper across Start Inte...

Страница 20: ...rmistor This circuit is energized by the boiler with a 5VDC potential DHW Stat Sensor TB1 9 and TB1 10 can be used to connect either an aquastat or remote DHW temperature sensor installed in a domesti...

Страница 21: ...prevent infiltration of air from conditioned space Joints in PVC or CPVC must be cemented For galvanized duct wrap each joint and seam with adhesive aluminum tape or other sealant The installation of...

Страница 22: ...12 inches of the ceiling and shall communicate directly with the outdoors or through a vertical or horizontal duct that communicates to the outdoors Minimum free area of the opening is 1 square inch f...

Страница 23: ...er by natural airflow from the outdoors and there is no draft regulator or draft hood in the same space there shall be a permanent opening with a cross sectional area not less than 1 sq in 30 000 Btu...

Страница 24: ...boiler is not certified for use with Type B vent nor with PVC venting All P K SONIC TM boilers are dual certified as a Category II and Category IV appliances as defined in ANSI Z21 13 CSA 4 9 latest e...

Страница 25: ...revent the possible re circulation of flue gases the vent designer must take into consideration such things as prevailing winds eddy zones building configurations etc Harsco Industrial Patterson Kelle...

Страница 26: ...ckflow through offline boiler s In addition Harsco Industrial Patterson Kelley also recommends the use of motorized dampers in the combustion air intake duct to help prevent the backflow of flue gases...

Страница 27: ...boilers under Category II conditions 1 A stainless steel vent adapter is required to mate the boiler exhaust connection and the vent pipe See the table below for the applicable part numbers 2 A normal...

Страница 28: ...t is received Relay C closes the 120VAC circuit external power supply which provides power to the damper motor opening the damper Once the motorized damper is fully open its end limit switch completes...

Страница 29: ...prefabricated venting systems must be installed according to the manufacturer s installation instructions Special care should be taken to ensure that any and all integral gasketing is properly assembl...

Страница 30: ...nspected in operation Follow the lighting instructions Adjust the thermostat so that the appliance will operate continuously 5 Test for spillage at the draft hood relief opening after 5 minutes of mai...

Страница 31: ...nd any other local codes which may apply in Canada see CAN CSA B 149 1 latest edition In the Commonwealth of Massachusetts the gas cock must be a T handle type Pipe Capacity for Natural Gas Nominal Ir...

Страница 32: ...to the boiler is the OUTLET and must be connected as the supply to the system All water piping must be installed such that no stresses are transmitted to the boiler The boiler shall not be used as a p...

Страница 33: ...lation of external limit controls may be required by certain codes or in certain installations Review applicable local codes for details NOTICE The low water cut off probe only prevents boiler operati...

Страница 34: ...rating a boiler that has failed a safety checks could result in injury Bypassing safety mechanisms will result in unsafe boiler operation which could result in injury or death After checking controls...

Страница 35: ...ler off open the downstream manual isolation valve then turn the boiler back on 3 10 2 Low Water Cut out Test The boiler is furnished with a probe type low water cut out The probe is installed near th...

Страница 36: ...al reset high temperature limit and finally touch any prompts from the NURO control 3 10 4 Gas Pressure Switch Tests 3 10 4 1 Low Gas Pressure Switch The boiler is furnished with a low gas pressure sw...

Страница 37: ...1 2 Startup When the boiler is powered on the NURO touchscreen will display an initial Startup Screen then the Local Representative screen This shows the name address and phone number of the local HAR...

Страница 38: ...p Wizard From the Home Screen press the Settings will load the Main Menu Screen shown at the right Touch the Comfort Heat Wizard to launch the Setup Wizard screen shown at the far right The first step...

Страница 39: ...Hot Water DHW Cascade etc please refer to the NURO Boiler Controller Advanced User s Guide Part Number is 1004905979 3 12Fuel Air Adjustments The P K MACH C750 C900 C1050 boilers are equipped with a g...

Страница 40: ...mended Combustion Settings for P K MACH Boilers 3 12 3 Adjusting High Fire Required Tools Flat head screwdriver and combustion analyzer Start the boiler and observe proper operating parameters for the...

Страница 41: ...label to increase or decrease the gas 3 Increasing the gas concentration decreases the O2 while decreasing the gas concentration increases the O2 There will be a slight time delay between the adjustm...

Страница 42: ...so could result in electrocution injury or death If overheating occurs or the gas supply fails to shut off do not turn off or disconnect the electrical supply to the pump Instead shut off the gas sup...

Страница 43: ...ies or remove the call for heat to the boiler Once the boiler completes a successful Post Purge and Post Pump it will return to Standby Once in standby turn the on off switch to the Off position Close...

Страница 44: ...RSCO Industrial Patterson Kelly blower warranty The boiler motor is permanently lubricated and does not require periodic lubrication 5 1 1 Semi Annually In addition to the recommended monthly service...

Страница 45: ...ustion settings table Refer to Section 3 12 2 Combustion Setup and Adjustment It is recommended that a copy of this report is filed for future reference 12 Perform a leak test of the gas valves in acc...

Страница 46: ...e agency that has been trained on the SONIC TM boiler 5 3 Cleaning the Burner Combustion Chamber Harsco Industrial Patterson Kelley recommends cleaning the burner and combustion chamber once annually...

Страница 47: ...and lower economizer The plugs in these ports can be removed for additional access to the fireside surfaces If necessary continue washing the fireside surfaces through these two washout ports 16 After...

Страница 48: ...blower 2 When the outlet water temperature drops below CH SETPOINT minus CH DIFFERENTIAL ON a heat request is generated 3 Provided all interlocks are made and the remote enable signal if installed is...

Страница 49: ...en insufficient gas pressure available for proper operation of the boiler If an external gas supply shut off valve is closed for any reason a low gas condition will result The NURO control will displa...

Страница 50: ...ayed the boiler lost the flame signal during operation Check that combustion is adjusted properly the gas pressure is correct and the ignition electrode ignition wire and gas valve are functioning pro...

Страница 51: ...al Patterson Kelly website www harscopk com When ordering replacement parts please have the model number and serial number of your boiler available Typical schematic drawings are shown on the followin...

Страница 52: ...able Normally Open Dry Contact C 240VAC Max Voltage 1 2Amp Max Current 18 15 RELAY C 17 14 RELAY D User Configurable Normally Open Dry Contact D 240VAC Max Voltage 1 2Amp Max Current 16 13 RELAY D N A...

Страница 53: ...ate 100 Firing Rate 20mA 1 Firing Rate 4mA 15 4 20mA ANALOG OUTPUT 14 NIGHT SETBACK Contact Closure Enables Night Setback Operation Open Circuit Disables Night Setback Operation 13 NIGHT SETBACK 12 OU...

Страница 54: ...00 SC 4000 208 VAC Three Phase 60 Hertz 6 1 4 2 SC 3000 SC 4000 220 240 VAC Three Phase 60 Hertz Before making any electrical connections to the boiler verify that the control transformer is properly...

Страница 55: ...M Gas Fired Boiler T T T Technical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 6 1 4 3 SC 3000 SC 4000 440 480 VAC Three Phas...

Страница 56: ...K SONIC TM Gas Fired Boiler T T T Technical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 6 1 5 SC 1500 SC 2000 Wiring Diagram...

Страница 57: ...P K SONIC TM Gas Fired Boiler T T T Technical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351...

Страница 58: ...P K SONIC TM Gas Fired Boiler T T T Technical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351...

Страница 59: ...P K SONIC TM Gas Fired Boiler T T T Technical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351...

Страница 60: ...SONIC TM Gas Fired Boiler T T T Technical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 6 1 6 SC 3000 SC 4000 480V Wiring Diag...

Страница 61: ...P K SONIC TM Gas Fired Boiler T T T Technical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351...

Страница 62: ...5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 6 1 7 Main Boiler Assembly SC 1500 SC 2000 Mark Description Mark Description 1 Heat Exchanger 5 Front Door NURO Touchscreen 2 Burne...

Страница 63: ...URO Control Panel SC 1500 SC 2000 Mark Description Mark Description 1 Push to Test LWCO Button 7 NURO Touchscreen Assembly 2 Manual Reset Hi Temp Limit 8 Clear Plastic Protective Cover 3 Circuit Break...

Страница 64: ...000 Mark Description Mark Description 1 Outlet Coupling 3 Victaulic 9 High Exhaust Pressure Switch Port 2 Relief Valve Port 10 Heat Exchanger 3 Supply Temperature Sensor 11 Heat Exch Temperature Senso...

Страница 65: ...cription Mark Description 1 Stainless Steel Mesh Burner 9 Blower Transition Piece 2 External Upstream Gas Cock 10 Combustion Blower Fan 3 Gas Piping Supports 11 Burner Transition Piece 4 Air Intake Tr...

Страница 66: ...5351 echnical Service 1 877 728 5351 6 2 Boiler Parts Identification SC 3000 SC 4000 6 2 1 Main Boiler Assembly SC 3000 SC 4000 Mark Description Mark Description 1 Heat Exchanger 5 Main Power Box 2 Bu...

Страница 67: ...RO Control Panel SC 3000 SC 4000 Mark Description Mark Description 1 Push to Test LWCO Button 7 NURO Touchscreen Assembly 2 Manual Reset Hi Temp Limit 8 Clear Plastic Protective Cover 3 Fuse Holder Fu...

Страница 68: ...51 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 6 2 3 Main Power Box SC 3000 SC 4000 Mark Description Mark Description 1 20A Three Phase Breaker Incoming Three Phase Power 4 Fuse Ho...

Страница 69: ...Coupling 4 Victaulic 10 High Exhaust Pressure Switch Port 2 ASME Section VIII Relief Valve 150 11 Section VIII Economizer 3 Supply Temperature Sensor 12 Interconnecting Elbows 4 Nuts Bolts 13 Internal...

Страница 70: ...SC 4000 Mark Description Mark Description 1 Stainless Steel Mesh Burner 8 High Gas Pressure Switch 2 External Upstream Gas Cock 9 Blower Transition Piece 3 Gas Piping Supports 10 Burner Transition Pie...

Страница 71: ...vice 1 877 728 5351 echnical Service 1 877 728 5351 6 2 6 Propane Gas Train SC 3000 SC 4000 Mark Description Mark Description 1 External Upstream Gas Cock 5 Internal Downstream Gas Cock 2 Gas Piping S...

Страница 72: ...P K SONIC TM Gas Fired Boiler T T T Technical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 7 Limited Warranty...

Страница 73: ...P K SONIC TM Gas Fired Boiler T T T Technical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 8 Boiler Fire Test Report...

Страница 74: ...oiler T T T Technical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 Appendix A Maintenance Log Date Hi Fire Low Fire O2 CO CO2...

Страница 75: ...h the boiler at high fire adjust the gas valves to get 5 O2 in the flue gas Refer to Section 3 12 2 Combustion Setup and Adjustment If this cannot be achieved perform the following steps If the O2 is...

Страница 76: ...T T Technical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 echnical Service 1 877 728 5351 Appendix C Water Quality Standards Quality Standards for Hydronic...

Страница 77: ...er Supply Carefully inspect the boiler s nameplate labels which describe the power supply requirements Provide an appropriate power feed to the boiler with overcurrent protection Boiler Model Power Su...

Страница 78: ...boilers This information is useful to help size an appropriate circulation pump Keep in mind this pressure drop represents the boiler only additional consideration is needed for any connecting piping...

Страница 79: ...rop represents the boiler only additional consideration is needed for any connecting piping valves strainers couplings flanges etc The table below summarizes the minimum and maximum flow restrictions...

Отзывы: