P-K THERMIFIC
®
Gas-Fired Boiler
45
5 MAINTENANCE
5.1 M
AINTENANCE AND
I
NSPECTION
S
CHEDULE
The Daily and Weekly observations can be done by operating personnel. Monthly, Semi-Annually and
Annually observations and any required adjustments, servicing, etc. should be performed by qualified
service personnel.
This schedule applies when the boiler is in use. Local codes or jobsite conditions may require more
frequent servicing. Verify proper operation after servicing.
Proper lockout / tagout procedure must be employed when servicing this unit.
Label all wires prior to disconnection when servicing controls. Wiring errors
can cause improper and dangerous operation.
Use care when reassembling main gas line to assure all connections are tight.
Use care when servicing boiler in order to prevent the accumulation of gas in
or around the combustion chamber.
Determine the cause of any lockout or errors before resetting the boiler. If
able to determine cause of lockout, then appropriate corrective action should be taken. If unable to
determine cause of the problem, call a qualified service technician. Verify proper operation after
servicing.
Verify proper operation after servicing.
5.1.1 Daily
Observe operating temperature and general conditions. Make sure that the flow of combustion and
ventilating air to the boiler is not obstructed. Determine the cause of any illuminated red indicators,
unusual noises or operating conditions and make the necessary corrections. Notify responsible
individuals for required corrective action or repair.
Check daily to be sure that the boiler area is free and clear of any combustible
materials, including flammable vapors and liquids.
5.1.2 Weekly
Observe the conditions of the pilot and main flame. A normal flame is blue. If the high fire flame is
yellow or if it pulsates, or if the burner starts with a rumble or puff, corrective action must be taken by
qualified personnel.
Содержание P-K THERMIFIC N700
Страница 2: ...P K THERMIFIC Gas Fired Boiler 2...
Страница 52: ...P K THERMIFIC Gas Fired Boiler 52 6 1 1 On Off 6 1 1 1 On Off Wiring Diagram 700 1000 1500 1700 2000...
Страница 53: ...P K THERMIFIC Gas Fired Boiler 53 6 1 1 2 On Off Sealed Combustion Diagram 700 1000...
Страница 54: ...P K THERMIFIC Gas Fired Boiler 54 6 1 1 3 On Off Sealed Combustion Diagram 1500 1700 2000...
Страница 55: ...P K THERMIFIC Gas Fired Boiler 55 6 1 2 Lo Hi Lo 6 1 2 1 Lo Hi Lo Wiring Diagram 1500 1700 2000...
Страница 56: ...P K THERMIFIC Gas Fired Boiler 56 6 1 2 2 Lo Hi Lo Sealed Combustion Diagram 1500 1700 2000...
Страница 57: ...P K THERMIFIC Gas Fired Boiler 57 6 1 3 Low Water Cutoff 6 1 3 1 Field Installed Low Water Cut Off Diagram...
Страница 58: ...P K THERMIFIC Gas Fired Boiler 58 6 1 3 2 Factory Installed Low Water Cut Off Diagram...
Страница 64: ...P K THERMIFIC Gas Fired Boiler 64...