To prevent the possible re-circulation of flue gases, the vent designer must take into consideration such
things as prevailing winds, eddy zones, building configurations, etc. Harsco Industrial, Patterson-Kelley
cannot be responsible for the effects such adverse conditions may have on the operation of the boilers.
Dimensions listed above are minimums and may not be sufficient for conditions at a specific job site.
Provide clearances between combustion air intake, exhaust vent, roof and wall surfaces, doors and
window as illustrated below. Also, provide clearances at least 2 feet above the expected snow line.
Exit Terminals of Mechanical Draft and Direct Vent Venting Systems
Reference: NFPA 54/ANSI Z223.1 National Fuel Gas Code
3.5.4 Fresh Air System (Ducted Combustion Air)
In some instances compliance with ANSI Z21.13 may not be required, in which case a "fresh air system"
may be used. Consultation with qualified professionals is required to determine whether a "fresh air
system" is suitable for any particular application and in compliance with all applicable codes and
regulations.
All flue gas outlet (exhaust vent) material for a fresh air system must be certified for use with a Category I
Appliance. (Standard B-vent is approved.) The exhaust vent may be run horizontally or vertically. Proper
vent sizing by the vent manufacturer's recommendation must be followed.
3.5.5 Sealed Combustion/Direct Vent Systems
P-K THERMIFIC
®
boilers are certified for operation with a sealed combustion air inlet and a sealed non-
pressurized venting system. These models are designated by the prefixes SN or SD
Содержание P-K THERMIFIC N700
Страница 2: ...P K THERMIFIC Gas Fired Boiler 2...
Страница 52: ...P K THERMIFIC Gas Fired Boiler 52 6 1 1 On Off 6 1 1 1 On Off Wiring Diagram 700 1000 1500 1700 2000...
Страница 53: ...P K THERMIFIC Gas Fired Boiler 53 6 1 1 2 On Off Sealed Combustion Diagram 700 1000...
Страница 54: ...P K THERMIFIC Gas Fired Boiler 54 6 1 1 3 On Off Sealed Combustion Diagram 1500 1700 2000...
Страница 55: ...P K THERMIFIC Gas Fired Boiler 55 6 1 2 Lo Hi Lo 6 1 2 1 Lo Hi Lo Wiring Diagram 1500 1700 2000...
Страница 56: ...P K THERMIFIC Gas Fired Boiler 56 6 1 2 2 Lo Hi Lo Sealed Combustion Diagram 1500 1700 2000...
Страница 57: ...P K THERMIFIC Gas Fired Boiler 57 6 1 3 Low Water Cutoff 6 1 3 1 Field Installed Low Water Cut Off Diagram...
Страница 58: ...P K THERMIFIC Gas Fired Boiler 58 6 1 3 2 Factory Installed Low Water Cut Off Diagram...
Страница 64: ...P K THERMIFIC Gas Fired Boiler 64...