AL815CC, AL825, AL825CC, AL835 Hybrid Installation & Owner's Manual 2017
17
TEC00037 2016FEB20 P/N: 630-00053 Rev A
SECTION 2 : INSTALLER
Installation
NOTE:
If the application will be lifting a heavier chair
/ scooter, drilling and bolting through the frame
becomes mandatory. [Figure 17-1] Please consult
the technical service department listed on the front
cover of this manual if you are unsure whether this is
required.
Recommended practice before drilling.
With base in position, take a tape measure and
estimate distance in both directions from an exterior
reference point (Ex: outside body panel) to all three
potential bolt holes.
Climb under vehicle and recreate measurements of
the three bolt holes.
Examine areas for framing, bracing, or other closely
available thickened structure to mount the lift
through.
Adjust position of base and leg extensions to capture
as much frame as possible while avoiding vehicle’s gas
tank, spare tire, suspension components, etc.
When you are confident of the position for all three
holes, climb into the truck bed. Using the base as
a template, mark the three locations with a pencil.
Remove base.
Drill down through truck bed with pilot holes in the
marked locations.
Climb under truck and inspect location of pilot holes.
Once again, be sure the larger hole will avoid vehicle’s
gas tank, spare tire, suspension components, etc.
Finish drilling all three holes with a 3/8” or slightly
larger drill bit.
POSSIBLE USE
FOR HEAVIER
APPLICATIONS
POSSIBLE USE
FOR HEAVIER
APPLICATIONS
[Figure 17-1]
CAUTION
USE EXTREME CAUTION
Avoid Gas Tank, Fuel / Brake /
Electrical Lines
[Figure 17-3]
[Figure 17-2]