AL625 & AL625HD
Page 14
REV: 1-24-12
STEP 7
MOUNTING THE PLATFORM ASSEMBLY TO THE TROLLEY ASSEMBLY
Using the pendant to control the lift, press “OUT” to move the lift out & down to the position shown.
With the help of an assistant – Lift the platform assembly sliding the deck pivot vertical tube into the slot on the
boom head on the trolley assembly.
Use
the 2 lower holes on the Vertical Tube. Insert the 3/8-16 Hex Head Cap
Screws (Bolts) and washers; tighten the 3/8-16 nyloc nuts to hold the tube in place.
Содержание AL625HD
Страница 5: ...AL625 AL625HD Page 5 REV 1 24 12 STEP 1 WIRING THE LIFT...
Страница 23: ...AL625 AL625HD Page 23 REV 1 24 12 ELECTRONIC CONTROL BOX WIRING DIAGRAM...
Страница 26: ...AL625 AL625HD Page 26 REV 1 24 12...
Страница 27: ...AL625 AL625HD Page 27 REV 1 24 12...
Страница 28: ...AL625 AL625HD Page 28 REV 1 24 12...