H. Installing Electrical Power

To install power to the furnace first remove the cover on the 

circuit breaker junction box. Figure 5.18.
Inside you will find the main terminal block. Reference Section 

6, Item B “Wiring Diagram” of this manual for location of main 

terminal block and proper power connections. In the bottom 

of the box a knockout hole is provided for the incoming wire 

and bulk hopper relay. 
The 

minimum 

recommended circuit is 15 Amp 120 VAC, 60 

Hz. This furnace should be the only appliance on the circuit. 

This furnace should never be powered by the use of an 

extension cord.

The recommended high and low voltages are, 130 VAC, 60 

Hz maximum high voltage, and 113 VAC, 60 Hz minimum 

low voltage.
The furnace will continue to operate at voltages as low as 105 

VAC, although it can not be guaranteed that automatic ignition 

will occur. Also, there is the possibility of a distribution blower 

motor overload.

NOTE: If other sources of electrical power are to be 

used (such as a generator) for normal operation or 

emergency operation, this source should be checked 

before installation. Many generators and inverters may not 

supply 120 VAC. 60Hz. power stable enough to operate 

the control board properly. (Control board damage could 

occur). 
Checking & Recording the Low Draft:

After the venting is completed, the firebox low draft will need to 

be checked and possibly adjusted. After removing the 3/8” bolt 

from the draft hole shown in Figure 5.19, insert the draft meter 

tube. The inner ash door and the hopper lid must be latched 

during this test. ( It is recommended that the draft meter have 

a scale of 0 to 1” WC.)
Turn the Feed Adjuster to “Test”. this will start the combustion 

blower  and  allow  you  to  check  and  record  the  High  Draft 

______ - IWC date _______ (There is no adjustment for the 

High Draft)
After  the  first  60  seconds,  the  “Test”  mode  lowers  the 

combustion blower voltage to the Low Burn voltage. During 

this  lowered  voltage  cycle  the 

low burn draft must be 

checked 

and adjusted if necessary. The recommended low 

draft setting should be between -.45 & -.55 IWC. Depending 

on the amount of vertical rise, it may not be possible to get a 

low draft reading in this range. In this case, a maximum low 

draft of -.55 is acceptable.
The adjustment screw is through the small hole to the right 

of the Igniter Light. Figure 5.20. Adjusted the Low Draft to 

__________ -IWC. 

Don’t forget to turn off of “Test” mode.

Figure 5.18

Draft meter bolt

Furnace Control Cover

Figure 5.19

“Test”

Low Draft Adjustment Pot

Figure 5.20

Circuit Breaker Junction Box

Содержание PF-120

Страница 1: ...allation Installation MUST comply with local regional state and national codes and regulations Contact local building or fire officials about restrictions and installation inspection requirements in y...

Страница 2: ...s Specifications 4 C Electrical Rating 4 D Mobile Home Approvals 4 E BTU Efficiency Specifications 4 2 Getting Started A Tools and Supplies Needed 5 B Inspect Appliance and Components 5 3 Clearances A...

Страница 3: ..._________ Electrical Section 1 Pg 4 120VAC unswitched power provided to the appliance ________________________________ Finishing Sections 3 4 Pg 8 14 Combustible materials not installed in non combust...

Страница 4: ...to the frame of the mobile home and use only listed pellet vent Class PL connector pipe A Harman Outside Air Kit must be installed in a mobile home installation MODEL Pellet Furnace PF 120 LABORATORY...

Страница 5: ...g the installation to ensure maximum safety and benefit WARNING Risk of Fire or Explosion Damaged parts could impair safe operation DO NOT install damaged incomplete or substitute components Keep appl...

Страница 6: ...iagram Dimensions are actual appliance dimensions Use for reference only 14 18 25 966 62 474 15 883 9 743 37 961 18 11 00 65 525 20 065 25 254 16 802 3 215 44 478 WITHOUT BLOWER BOX INSTALLED 27 238 2...

Страница 7: ...sh pan door The 18 clearance from the hopper end is a manufacturer s recommendation for adding pellets and or servicing the feeder mechanism The minimum clearance to the top of the plenum is 4 Fig 3 3...

Страница 8: ...The United States J Floor Protection Requirements US Sides 8 K Front 18 C Floor Protection The shaded area indicates the required floor protection area The furnace requires 48 x 52 of floor protectio...

Страница 9: ...onfiguration Graph under Section B Locating Your Appliance Chimney Each Vertical 90 or T subtract 2 5 feet Each Vertical 45 subtract 1 5 feet Each Horizontal 90 or T subtract 5 0 feet Each Horizontal...

Страница 10: ...intain specified clearances to windows doors and air inlets including air conditioners Vents should not be placed below ventilated soffits Avoid venting into alcove locations Vents should not terminat...

Страница 11: ...fsets Consider the appliance location relative to floor and ceiling and attic joists DO NOT CONNECT THIS UNIT TOACHIMNEY FLUE SERVICING ANOTHER APPLIANCE May allow flue gases to enter the house CAUTIO...

Страница 12: ...regulator assembly when measured from the horizontal center line of the regulator I The clearance to service regulator vent outlet must be a minimum of 6 feet J The clearance to a non mechanical air s...

Страница 13: ...ombine with expelled moisture to form creosote The creosote vapors condense in the relatively cool chimney flue of a slow burning fire As a result creosote residue accumulates on the flue lining When...

Страница 14: ...nd chimney To measure the draft or negative pressure on your appliance use a magnahelic or a digital pressure gauge capable of reading 0 1 inches of water column W C The appliance should be running on...

Страница 15: ...NOT install damaged components Do NOT install incomplete components Do NOT install substitute components Report damaged parts to dealer WARNING WARNING Do not relocate or bypass any of the safety cont...

Страница 16: ...y the demands of the pellet appliance but consideration must be given to the total house demand House demand may consume some air needed for the stove especially during a power failure It may be neces...

Страница 17: ...is access to the combustion blower and flue area 1 Place the bottom on the floor The edge closest to the knockouts will be the edge towards the furnace See Figure 5 1 2 Place the desired vertical pan...

Страница 18: ...bottom middle hole under the filter opening NOTE Do not put any screws into any of the top holes at this time Filter Frame Panel Filter opening must be up 4 Place the remaining panel in this case the...

Страница 19: ...sure that the setscrew on the flex connector is not pointing toward the furnace end of the box when the locknut is fully tightened The filter box is now ready to install onto the furnace Note The blo...

Страница 20: ...Y DUCT WORK OR IN FREE AIR WILL CAUSE MOTOR OVERLOAD AND PREMATURE FAILURE 3 Mount the filter box on the furnace with 6 10 x 3 4 Tek screws 3 on each side Figure 5 10 Visually locate these holes so yo...

Страница 21: ...Orange Blue White Orange White Blue This section is not used on this unit CAUTION With this small gauge of wire care must be taken not to over tighten the terminal screws thus breaking the wire There...

Страница 22: ...dampers 2 should be installed in the ductwork 1 in the warm air supply duct for the existing furnace and 1 in the warm air supply duct of the pellet furnace after or downstream of the high limit fan c...

Страница 23: ...ct system can be installed to fit the customers needs Velocity 500fpm 700fpm 900fpm Static In W C 3 Minimum to 6 Maximum 1638 cfm 470 in 360 in 290 in These duct sizes are only recommendations The Ret...

Страница 24: ...blower size is 75 to 1 CFM for each square foot of conditioned space standard 8 ceiling height This furnace can be fitted with an air conditioning coil mounted in the supply air plenum HHT is not resp...

Страница 25: ...t the WHITE and SKY BLUE wires to the LIMIT switch It doesn t matter which wire is on which screw Figure 5 17 8 Make sure that all of the wires are out of the way when closing the cover Excess twistin...

Страница 26: ...ply 120 VAC 60Hz power stable enough to operate the control board properly Control board damage could occur Checking Recording the Low Draft After the venting is completed the firebox low draft will n...

Страница 27: ...shall comply with CSA B139 The installation of a gas furnace shall comply with the applicable requirements of CSA B365 and if changes are made to the installation of the gas furnace including clearanc...

Страница 28: ...WHITE GREEN N L BROWN DRK BLUE VIOLET BROWN BLACK RED BROWN G R E E N WHITE WHITE GREEN WHITE BROWN SKY BLUE WHITE RED BROWN WHITE BLACK SKY BLUE YELLOW HIGH VOLTAGE YELLOW VIOLET SKY BLUE WHITE 3 8...

Страница 29: ...Harman PF 120 Installation Manual_R1 2014 ___ 03 14 29 3 90 08121i...

Страница 30: ...n U S A Copyright 2012 Harman a brand of Hearth Home Technologies Inc 352 Mountain House Road Halifax PA 17032 www harmanstove com Please contact your Harman dealer with any questions or concerns For...

Отзывы: