background image

 Smartmeter

eCB1-LR

Configuraon instrucons

Configuration instructions 

eCB1

 

smartmeter

Version: 1.2.3

1

E

n

g

li

s

h

Содержание eCB1-LR

Страница 1: ...Smartmeter eCB1 LR Configura on instruc ons Configuration instructions eCB1 smartmeter Version 1 2 3 1 English ...

Страница 2: ... region 9 Date und me 9 Network se ngs 10 Internal 11 Charge connector 1 12 Finish setup 12 Explana on of the web interface PV load control 14 Configura on of the eCB1 LR PV PV load control 15 Language und region 15 Date und me 16 Network se ngs 17 House connec on 18 Charge connector 1 20 Setup comple on 22 Firmware update 23 Important se ngs for opera on 23 Charge Log 26 Warranty Guarantee 28 Guar...

Страница 3: ...rer eCHARGE Hardy Barth GmbH Leinbergstraße 14 92262 Birgland Schwend telephone 49 9666 188 1350 telefax 49 9666 188 1351 web www echarge de mail support echarge de Configuration instructions eCB1 smartmeter Version 1 2 3 3 ...

Страница 4: ...ccured orange Network LED Off no connection permanent green connection active green flashing network activity Bus LED Off device is not configured green connection is ok orange no device detected red BUS error Reset funktion You can reset the eCB1 to network settings or simply restart the device by pressing the reset button The time period of pressure applied is important Reset to factory settings...

Страница 5: ...t your browser 2 Type in the following URL http ecb1 local see image below The user interface of the eCB1 opens If the user interface does not open please check the following points 1 Name resolution does not work Configuration instructions eCB1 smartmeter Version 1 2 3 5 Connect the eCB1 to your network using a LAN cable and insert it into the LAN port of the eCB1 Connect your PC laptop with your...

Страница 6: ...cted to the eCB1 3 The status LED glows or blinks red If the status LED glows or blinks red an error has occured Please restart the eCB1 by pressing the reset button with a pointy objet for about 1 to 3 seconds 4 The Network LED does not glow If the network LED does not glow the network cable is not properly correctly connected to the network port Please make sure that you have inserted both ends ...

Страница 7: ...of the eCB1 Please note the green marks in Image These have to be connected as follows Plug the brown wire second slot on the eCB1 in 1 shown in Image 1 Plug the black wire third slot on the eCB1 in 2 Last step you plug the blue wire first slot on the eCB1 in 3 Configuration instructions eCB1 smartmeter Version 1 2 3 7 1 2 1 ...

Страница 8: ...ugh the interface of the router you can find the IP address of all eCB1 including this one If therer is no other configured eCB1 in your Network you can contact the eCB1 MP with http ecb1 local for first configuration If the Domane Name System does not work you can find the IP adress through the Webinterface of your router The following page should open up Please click proceed to get to the follow...

Страница 9: ...he country in which you are installing the charging station and the time zone Date und time Click proceed to get the following screen Here you can set the time and date manually or automatically Configuration instructions eCB1 smartmeter Version 1 2 3 9 ...

Страница 10: ... with a different or your own time server please enter the internet address manually By clicking automatic synchronise at boot the time will be synchronised automatically after every outage power network etc After completion of the time and date settings click on proceed to get to the next section Network settings If you choose DHCP as protocol Your DHCP Server e g router will do further settings ...

Страница 11: ...the corresponding fileds in a network compatible manner Internal In this section you will determine the function of the eCB1 As you are configuring an eCB1 metering point that is installed at the house connection please choose the device function building service head Configuration instructions eCB1 smartmeter Version 1 2 3 11 ...

Страница 12: ...utton to activate orange and deactivate grey Usually by German law a measuring transformer is required when the house connection exceeds 63A Charge connector 1 In this case the eCB1 LR MP is responsible for the measurement at the house connection and does not require a charging point Choose No EVCC EVCC charge controller Press proceed to finish the seutup Finish setup Configuration instructions eC...

Страница 13: ...n automatically after the restart Should no interface appear after five minutes please refresh the page or enter the IP address again The setup finish ends the configuration process of the eCB1 LR MP and you can start to configurate the other eCB1 Configuration instructions eCB1 smartmeter Version 1 2 3 13 eCB1 reboot in progress ...

Страница 14: ...atically start in case of surplus PV power or turn off when there is too little PV power For this section Eco Min Max Ampere in the later configuration is the most important setting Fast charging Charge with maximum capacity of the charging station Manual charging Set the charging power manually Start charging Start the charging process Stop charging Stop the charging process Current charging grap...

Страница 15: ...the web interface Click Proceed to get to the following selection Language und region Here you can set the language the country in which you are installing the charging station and the time zone Configuration instructions eCB1 smartmeter Version 1 2 3 15 ...

Страница 16: ...the settings will be saved Automatic setting In this case Date and Time do not need any entries There are pre set internet pages in section NTP Server 1 and NTP Server 2 These will connect you automatically with a time server Click on Set time by ntp to save your settings If you want to connect with a different or your own time server please enter the internet address manually By clicking automati...

Страница 17: ...her settings to be made in the section except selecting a hostname Please select a distinct host name The device should respond to the given hostnamen givenname local Upon delivery the hostname given is ecb1 local If you select static for protocol You have to enter the network settings manually Contact your network configurator to fill in the corresponding fileds in a network compatible manner Con...

Страница 18: ...er Only activate measurement via current transformer when a current transformer is installed This usually is only the case when the house connection exceeds 63 A If an eCB1 LR MP has already been installed and this setting has already been chosen for the first device during the earlier described configuration process see page 11 it is not necessary to activate it again Configuration instructions e...

Страница 19: ...anitza UMG power quality analyser a Janitza UMG network analyser is installed at the house connection KLEFR 6934 Meter a KLEFR Energy Meter is installed at the house connection PHOENIX CONTACT measuring point a Phoenix Contact measuring point is installed at the house Passive push updated measuring point via http Post via API gateway updated measuring point No measuring point There is no measuring...

Страница 20: ...ype manufacturer eCB1 internal an eCB1 PV is built in the charging station for PV load control KLEFR Energy Meter KLEFR Energy Meter is installed as measuring point in the charging station Phoenix Contact Messpunkt Phoenix Contact measuring point is instaled in the charging station Configuration instructions eCB1 smartmeter Version 1 2 3 20 ...

Страница 21: ...troller The system usually pre determines the corecct EVCC Should that not be the cast please choose EVCC Phoenix Contact Modbus RTU At Bus ID enter the number 1 for charging point 1 Bus ID 2 is assigned for charging pont 2 Configuration instructions eCB1 smartmeter Version 1 2 3 21 ...

Страница 22: ...open automatically after the restart Should no interface appear after five minutes please refresh the page or enter the IP address again Here you can adjust the base settings These settings are those from the initial configuration Configuration instructions eCB1 smartmeter Version 1 2 3 22 Charge connector 1 Finish setup eCB1 reboot in progress ...

Страница 23: ... Hardy Barth GmbH in order to issue a firmware update if needed Mail support echarge de Important settings for operation In order to guarantee the best operation possible according to your own infrastructure several important settings are required in this section Those are saved automatically and are active immediately 1 Building service head Configuration instructions eCB1 smartmeter Version 1 2 ...

Страница 24: ...er solar produced energy energy consumption at house connection be lower than the required minimum charging power the car will continue charging It will get the remaining power needed to fill up the balance until the required minimum charging power from the grid 4 Ref Value ECO Mode 0 Watt Settings in this section determine how much energy is allowed to be drawn from the grid to charge your Electr...

Страница 25: ...sword 8 255 letters Deleting username and password Changing username and password 1 Open the webinterface and log in 2 Go to Configuration Settings 3 Delete the username and the password 4 Press Apply 1 Open the webinterface and log in 2 Delete current username and password 3 Set a new username and a new password 4 Press Apply Summary of settings In section info all information of the eCB1 PV and ...

Страница 26: ...s data into CSV Export the charging process data into PDF file Print directly Hide single columns Restore visibly settings Additionally you can view the current state of all your charging points When charging instead of No current charging the state will change to Charging since as an example 1 Minute 0 8kWh Configuration instructions eCB1 smartmeter Version 1 2 3 26 ...

Страница 27: ... was drawn in total L1 L2 L3 current flow in the individual phases Batterie The charge state of the battery charging and discharging is shown Ohmpilot The power consumption is displayed Only possible in combination with the Fronius Hybrid Series cPµ1 T13 8 Energy power consumption of 5 5 W Counter the cPµ1 drew 2050 51 W in total L1 L2 L3 current flow in the individual phases EVCC Internal data Co...

Страница 28: ...ges and liability This includes claims which are attributable to the following causes 1 Deterioration due to normal wear and tear corrision damage accident incorrect storage or operation lack of reasonable and necessary maintance 2 Wallbox installation services carried out by unauthorised persons by an unauthorised electrician installers not auhorised by eCHARGE Hardy Barth GmbH or the customer hi...

Страница 29: ... or manufacturing defects In these cases the manufacturer will attempt to restore the proper functioning of the product in cooperation with the local distributor Any costs incurred for the transport of the product shall be borne by the customer If the serial number has been removed from the wallbox through the fault of the customer or if it has been altered or is illegible all rights granted under...

Страница 30: ... ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ __________________________________...

Страница 31: ...__________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ...

Отзывы: