
3 - Description
29
Platform
To get access to the platform:
•
Pull the step up and swing the step (H) out until it clicks into locked
out-position. Retract by pulling up and swing step back to locked
in-position.
Components:
A.
Main tank lid.
B.
Pressure gauge and EasyClean clogging indicator.
C.
Main tank drain valve.
D.
Clean water tank lid.
E.
Handbrake.
F.
Pressure regulation valve.
G.
Agitation valve.
H.
Step.
Right side cover
The right side cover is opened by turning the handle in the lower rear
corner of the cover and lifting the cover up.
Components:
A.
Jobcom box
B.
Work and road lights box.
C.
Clean water tank.
The clean water tank is integrated to the side cover and is filled
from the platform when right side cover is closed.
μ
ATTENTION! Only open the right side cover when the clean water
tank (optional) is empty!
Tank level indicator
The actual tank level in the main tank can be observed on the tank level
indicator. The scale is displayed in litres or Imp. gal/US gal. (certain
countries).
μ
ATTENTION! The level indicator is only a guidance for the tank
level.
The total deviation of accuracy for the level is 7.5% for below 20%
filled tank. For above 20% filled tank the total deviation of
accuracy is 5%.
Just behind the main tank scale a level for the rinsing tank is fitted to the
frame. This is a guidance to see if rinsing tank is full or empty. If the
guidance ball is in top then the rinsing tank is full.
Содержание NAVIGATOR DELTA
Страница 4: ...1 EC Declaration 4 ...
Страница 10: ...Table of Contents 10 ...
Страница 14: ...2 Safety notes 14 ...
Страница 32: ...3 Description 32 ...
Страница 54: ...4 Sprayer setup 54 ...
Страница 74: ...5 Operation 74 ...
Страница 76: ...6 Maintenance 76 Boom lubrication oiling plan ...
Страница 77: ...6 Maintenance 77 Trailer lubrication oiling plan P T O lubrication oiling plan Serie 100 type P T O shaft C 50 ...
Страница 104: ...7 Fault finding 104 ...
Страница 120: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 Nørre Alslev DENMARK ...