4 - Sprayer Setup
78
Adjustment of Boom Folding Speed
The main hydraulic block manages hydraulic pressure for the boom
controls.
The throttle valve (A) can adjust the folding speed of the boom.
Check the Folding Speed
•
Unfold the boom.
•
Fold the outer boom sections calmly into the transport position
without crashing hard against the other boom sections.
The folding speed is set from factory - however it may be adjusted
before use of the sprayer if the operator finds it necessary.
Factory setting:
The valve is screwed completely in and 1/2 turn back out.
ATTENTION! The throttle valve only needs slight adjustments to
change the speed significantly.
ATTENTION! If the boom moves to fast:
Risk of premature wear and tear.
Risk of damaging the boom parts.
To Decrease Folding Speed
•
Loosen the counternut.
•
Screw the valve inwards.
•
Tighten the counternut again.
To Increase Folding Speed
•
Loosen the counternut.
•
Screw the valve outwards.
•
Tighten the counternut again.
ATTENTION! The system must be depressurized during the adjustment.
Tools Needed
Size: 17 mm
Size: 5 mm
A
Содержание MEGA VPZ MASTER
Страница 1: ...MEGA VPZ Original Instruction book 67050600 110 version 1 10 GB 03 2018 www hardi international com...
Страница 4: ...1 EU Declaration 4...
Страница 10: ...Table of Contents 10...
Страница 42: ...2 Safety Notes 42...
Страница 68: ...3 Description 68...
Страница 118: ...5 Operation 118...
Страница 121: ...6 Maintenance 121 Lubrication Plan Boom Centre Close up of Glide Shoes to be Lubricated...
Страница 122: ...6 Maintenance 122 Lubrication Plan Boom Wings Both boom wings left and right are to be lubricated equally 10...
Страница 172: ...8 Technical Specifications 172...
Страница 176: ...Index 176...
Страница 178: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 N rre Alslev DENMARK...