6 - Maintenance
6.14
If it becomes difficult to build up sufficient pressure or if pressure
fluctuations occur, it may be necessary to renew cone and cylinder.
A spare parts kit can be ordered - contact your local dealer to service
the unit.
1. Remove 4 x screws (A) and remove the housing.
2. Remove 4 x screws (B) and remove cone.
3. Loosen nut (C) in bottom of the cone.
4. Replace with parts from spare parts kit.
5. Reassemble in reverse order.
Periodically check the distribution valves for proper sealing. Do this
by running the sprayer with clean water and open all distribution
valves. Cautiously remove the clip (A) and pull out the hose (B) for
the return line. When the housing is drained, there should be no liq-
uid flow through the return line. If there is any leakage, the valve
cone (E) must be changed. Remove the clip (C) and lift the motor
housing off the valve housing. Then unscrew the screw (D) and
replace the valve cone (E). Reassemble in reverse order.
The level indicator reading should be checked regularly. When the
tank is empty, the float should lie on the stop pin, of the rod, and
the O-ring on the indicator should be positioned at the top position
line (A).
If any deviation is found, pull out the plug (B), loosen screws (C), and
adjust the length of the cord.
Level indicator adjustment
Cone check/renewal for EFC distribution valve
Cone check/renewal for EFC operating unit
Содержание COMMANDER TWIN FORCE Series
Страница 1: ...COMMANDER TWIN FORCE www hardi international com 67000200 Version 1 03 GB 06 2007 Instruction book ...
Страница 8: ...Table of contents TOC 6 ...
Страница 10: ...1 CE Declaration 1 2 ...
Страница 14: ...2 Safety notes 2 4 ...
Страница 66: ...6 Maintenance 6 2 Boom lubrication oiling plan 32 36 m ...
Страница 67: ...6 Maintenance 6 3 Trailer lubrication oiling plan ...
Страница 107: ...8 Technical specifications 8 11 Charts Boom hydraulic Y Boom hydraulic Z ...
Страница 108: ...8 Technical specifications 8 12 Sprayer hydraulic Fan transmission ...
Страница 109: ...8 Technical specifications 8 13 Electrical specifications for boom and work light ...
Страница 110: ...8 Technical specifications 8 14 ...