5 - Operation
5.10
ATTENTION! If there is not time enough to fill all chemicals into the ChemFiller before main tank is full, then it is
possible to slow down filling proces by partly closing the External Filling Device valve.
DANGER! Do not press lever unless the multi-hole nozzle is covered by a container to avoid spray liquid hitting the
operator.
In order to close the entire boom, switch ON/OFF (3) to OFF posi-
tion. This returns the pump output to the tank through the return
system. The diaphragm Non-drip valves ensure instantaneous clo-
sing of all nozzles.
In order to close one or more sections of the boom, switch the rele-
vant distribution valve (9) to off position. The pressure equalisation
ensures that the pressure does not rise in the sections which are to
remain open.
On the sprayer the suction SmartValve should be turned toward
“Suction from Main tank” and pressure SmartValve should be turned
toward “Spraying”. Turn the agitation valve to “Agitation” if necessary.
The switches on the spray control box controls the following
functions:
1. Power ON/OFF
2. Spray pressure regulation
3. Main valve ON/OFF
4. End nozzle (Left/OFF/Right)
5. Foam marker blob interval
6. Foam marker (Left/OFF/Right)
7. Section valves
8. Optional function
If a spraying job has been interrupted for a while, severe sedimenta-
tion can occur depending on chemicals being used. When re-star-
ting spray job it might be necessary to agitate sedimented material
first.
1. Turn handle at the suction SmartValve towards “Suction from main
tank”. Turn pressure SmartValve towards “Pressure emptying” or not
used function and turn the Agitation valve towards “Agitation”. Other
valves closed.
2. Engage the pump and set P.T.O. speed at 540 r/min or 1000 r/min
(depending on pump model).
3. Agitation has started and should be continued for at least 10
minutes.
4. Revival of the spraying can begin. Turn pressure SmartValve
towards “Spraying” and start spraying..
Operating the control unit while spraying
Agitation before re-starting spraying
Содержание COMMANDER TWIN FORCE Series
Страница 1: ...COMMANDER TWIN FORCE www hardi international com 67000200 Version 1 03 GB 06 2007 Instruction book ...
Страница 8: ...Table of contents TOC 6 ...
Страница 10: ...1 CE Declaration 1 2 ...
Страница 14: ...2 Safety notes 2 4 ...
Страница 66: ...6 Maintenance 6 2 Boom lubrication oiling plan 32 36 m ...
Страница 67: ...6 Maintenance 6 3 Trailer lubrication oiling plan ...
Страница 107: ...8 Technical specifications 8 11 Charts Boom hydraulic Y Boom hydraulic Z ...
Страница 108: ...8 Technical specifications 8 12 Sprayer hydraulic Fan transmission ...
Страница 109: ...8 Technical specifications 8 13 Electrical specifications for boom and work light ...
Страница 110: ...8 Technical specifications 8 14 ...