6 - Maintenance
6.9
WARNING! Always prime the circuit if the hydraulic brake lines have been dismantled.
Apply brakes to full pressure and inspect brake lines for damages or leaks. Replace damaged parts. If the hydraulic brake
lines have been dismantled the circuit must be primed afterwards:
1. Loosen brake hose at both brake cylinders.
2. Apply brake until oil without air bubbles come out.
3. Tighten brake hose before relieving the brake again.
Change the protection tube nylon bearings as described under “Shield renewal on transmission shaft”.
Change the hydraulic oil filter after the first 50 hours and then every
500 hours or once a year - whichever comes first.
Always change the oil filter if the vacummeter indicator is in the red
area. Check when the oil has reached working temperature.
1. Place e.g. a drain pan or a cloth under the filter to retain waste oil
and unscrew the filter cartridge.
2. The new filter cartridge is filled with fresh clean hydraulic oil.
Apply a thin oil film to the cartridge seal.
3. Screw the filter cartridge on until the seal is lying against the flan-
ge.
4. Tighten the filter cartridge another 1/2 to 3/4 turn.
5. Check hydraulic oil level - top up with fresh clean hydraulic oil if
necessary.
6. Set the blower in neutral, start the tractor P.T.O. and let it run idle
for 5 min. to prime the sysstem.
7. After 5 min. the blower r.p.m. can gradually be increased to full
speed.
Disposal of used hydraulic filter cartridges must only take place in
accordance with local legislation.
1000 hours service - Transmission shaft
500 hours service - Hydraulic oil filter
250 hours service - Hydraulic brakes
Содержание COMMANDER TWIN FORCE Series
Страница 1: ...COMMANDER TWIN FORCE www hardi international com 67000200 Version 1 03 GB 06 2007 Instruction book ...
Страница 8: ...Table of contents TOC 6 ...
Страница 10: ...1 CE Declaration 1 2 ...
Страница 14: ...2 Safety notes 2 4 ...
Страница 66: ...6 Maintenance 6 2 Boom lubrication oiling plan 32 36 m ...
Страница 67: ...6 Maintenance 6 3 Trailer lubrication oiling plan ...
Страница 107: ...8 Technical specifications 8 11 Charts Boom hydraulic Y Boom hydraulic Z ...
Страница 108: ...8 Technical specifications 8 12 Sprayer hydraulic Fan transmission ...
Страница 109: ...8 Technical specifications 8 13 Electrical specifications for boom and work light ...
Страница 110: ...8 Technical specifications 8 14 ...