background image

7

A microprocessor controlled special tungsten lamp emits radiation which is first optically conditioned
and beamed to the sample contained in the cuvet. The optical path is fixed by the diameter of the
cuvet. Then the light is spectrally filtered to a narrow spectral bandwidth, to obtain a light beam of
intensity 

I

o

 or 

I.

The photoelectric cell collects the radiation 

I

 that is not absorbed by the sample and converts it into

an electric current, producing a potential in the mV range.
The microprocessor uses this potential to convert the incoming value into the desired measuring unit
and to display it on the LCD.
The measurement process is carried out in two phases: first the meter is zeroed and then the actual
measurement is performed.
The cuvet has a very important role because it is an optical element and thus requires particular
attention. It is important that both the measurement and the calibration (zeroing) cuvets are optically

identical to provide the same measurement conditions. Whenever possible use the same cuvet for
both. It is necessary that the surface of the cuvet is clean and not scratched. This to avoid measurement
interference due to unwanted reflection and absorption of light. It is recommended not to touch the
cuvet walls with hands.
Furthermore, in order to maintain the same conditions during the zeroing and the measuring phases,
it is necessary to close the cuvet to prevent any contamination.

1) Liquid Crystal Display (LCD)
2) Cuvet Holder
3) Cuvet alignment indicator
4) ON/OFF key
5) ZERO key
6) READ/TIMER key
7) CAL CHECK key

FUNCTIONAL DESCRIPTION

14

• Hold READ/TIMER for three seconds. The   display

will show the countdown prior to measurement.
Alternatively, wait for 1 minute and just press
READ/TIMER.

In both cases “SIP” will blink during
measurement.

• The instrument directly displays concentration in

mg/L of free chlorine on the Liquid Crystal Display.

or

INTERFERENCES

• Alkalinity:

• Acidity:

• Hardness:

• Bromine (Br

2

):

• Chlorine dioxide (ClO

2

):

• Iodine (I

2

):

• Oxidized Manganese

and Chromium:

• Ozone (O

3

):

above 1,000 mg/L CaCO

if present as bicarbonate (HCO

3

-

, sample pH

< 8.3); above 250 mg/L CaCO

if present as carbonate (CO

3

2-

,

sample pH > 9.0).
In both cases, it will not reliably develop the full amount of color or it
may rapidly fade (negative error). To resolve this, neutralize the

sample with diluted HCl.
above 150 mg/L CaCO

3

. May not reliably develop the full amount of

color or it may rapidly fade (negative error). To resolve this, neutralize
the sample with diluted NaOH.
in case of water with hardness greater than 500 mg/L CaCO

3

, shake

the sample for approximately 2 minutes after adding the powder
reagent.
positive error.
positive error.
positive error.
positive error.

positive error.

Содержание HI 95701C

Страница 1: ...1 Instruction Manual HI 95701C Free Chlorine ISM w w w h a n n a i n s t c o m This Instrument is in Compliance with the CE Directives 20 MAN95701R2 05 06 w w w h a n n a i n s t c o m...

Страница 2: ...take all necessary steps to correct interferences Any variation introduced by the user to the supplied equipment may degrade the instruments EMC performance To avoid damages or burns do not put the i...

Страница 3: ...ER ACCESSORIES HI 95701 11 CAL CHECK Standard Cuvets 1 set HI 710009 Blue rubber boot HI 710010 Orange rubber boot HI 721310 9V battery 10 pcs HI 731318 Tissue for wiping cuvets 4 pcs HI 731331 Glass...

Страница 4: ...HI 95701 meter measures the free chlorine Cl2 content in water samples in the 0 00 to 5 00 mg L ppm range The method is an adaption of the Standard Method 4500 Cl G for drinking water The reagent is i...

Страница 5: ...a standard solution of 1 00 mg L chlorine and a representative lot of reagent an operator obtained with a single instrument a standard deviation of 0 02 mg L SPECIFICATIONS PRECISION AND ACCURACY 16 C...

Страница 6: ...narrow band interference filters to guarantee both high performance and reliable results HI 95 series block diagram optical layout PRINCIPLE OF OPERATION 15 Turn the meter on by pressing ON OFF When...

Страница 7: ...vet walls with hands Furthermore in order to maintain the same conditions during the zeroing and the measuring phases it is necessary to close the cuvet to prevent any contamination 1 Liquid Crystal D...

Страница 8: ...icons appear above the number of month and day when a date is displayed 4 the blinking Battery icon appears when the battery voltage is getting low 13 MEASUREMENT PROCEDURE Turn the meter on by pressi...

Страница 9: ...bration is selected GUIDE TO DISPLAY CODES 12 It is important that the sample does not contain any debris This would corrupt the reading Each time the cuvet is used the cap must be tightened to the sa...

Страница 10: ...ed thesampleandthezerocuvetareinverted Zero a zero reading was not taken Follow the instruction in the measurement procedure for zeroing the meter 11 The instructions listed below should be carefully...

Отзывы: